Getting a hole ready for the instolation of a new pump station

Ok,,,,,,Now that he has it dug,,,,,,,,,,what the heck is he going to do with it.

Pumping the ground water out, and setting up the crain.

setting the base in, after the water is out, and the botton is set to grade.

This shot shows you how deep it is, and  the top section is being put in place.