04-Nov-2006: Carina sustaining the 4" PVC tube, fiberglassed with 4 layers of cloth of 450 gr/m2 for the passage of the rudder axis.

09-Nov-2006: Hole for passage of the telescope tube.

09-Nov-2006: Telescope tube inside the wooden structure that supported it, seen from above. The space between the wooden box and the tube was stuffed with epoxi and sawdust.
09-Nov-2006: See of below.

09-Nov-2006: Edges of cabin already rounded and hatch placed for testing. Hole for the center hatch opened. The lateral windows placed to leveling.

09-Nov-2006: Section 11 placed and cockpit completed. The reinforcements are already placed to support the swim platform.
09-Nov-2006: Upper view of the structure of the swim platform. Placed for testing the "block "of the telescope tube.

09-Nov-2006: Frontal view of Sirius with the hatch's bases already finished. Impressive!!

09-Nov-2006: Aft view. The closed bathtub is observed and transformed in I deposit of tools.
10-Nov-2006: Aft deck finished. My girls taking advantage of sun and imagining as it will be in the water.

10-Nov-2006: View from prow of the deck finished.

10-Nov-2006: Aft view...
10-Nov-2006: Another view more....that nice!!!

10-Nov-2006: One more....It is lacking to sand the cabin and rounding the edges of the overboard.

14-Nov-2006: Lateral of entrance cabin finished. Inside, I opened the aft room entrance in the section 7.
14-Nov-2006: Finally I completed the construcion of the aft mirror and the swim platform.

14-Nov-2006: Prow view. Openings for lateral windows already made.

14-Nov-2006: Finally we paint again with epoxi primer. The next time we will give the second hand. It is observed the consequences of the "war of paint rollers."... I lose!!!.