Universiti Putra Malaysia invites joint ventures to develop strategic
alliances for other applications.
Presented more than 50 papers in international and national conferences
and seminars.
Countries presented:
Bangkok, Barcelona, Istanbul, Honolulu, Newcastle upon Tyne UK, Hong
Kong, Paris, Surabaya, Bogor Indonesia, Columbia, Perth, Crete, Athens, Copenhagen, Hawaii, USA, Alberta, Poland and India.
Completed Projects:
-
(1) Master Plan/Structure Plan/Local Plan:
Acted as consultant for Jabatan Perancang Bandar dan Desa to produce
structure plans and local plans sectors related to sewage, domestic solid
waste and industrial waste management.
Jobs completed include:
Sg langat river water quality improvement and rehabilitation (2001)
Kubang Pasu Local Plan, Kedah (1995-2005)
Padang Lalang and Padang Matsirat, Langkawi Local Plans (1995-2005)
Alor Star and Kuala Kedah Local Plan (1995-2005)
Parit Buntar Local Plan (1995-2005)
Sepang and Kuala Langat Structure Plan (1995-2010)
Majlis Perbandaran Ampang Jaya, Majilis Daerah Gombak and Majlis Daerah
Hulu Langat Structure Plan (1996-2010)
Sitiawan-Manjung Structure Plan (1997-2010)
MPPJ Pollution Studies - Wastes and Industries (1994)
Putra Jaya Preliminary Ecology Master Plan (1994)
Multi-Media Super Corridor (MSC) Environmental Guidelines (1997)
Cyberjaya Infra-Master Plan on Sewerage and Solid Wastes (1997)
Kelantan Strategic Master plan (1998)- on infrastructure
Kajian Taman AgroTek Juru Penang, IADP (1998) - environmental and feasibility.
-
(2) Environmental Impact Assessment:
Acted as consultant in more than 45 EIA studies on various projects
:
industrial estates, highways, waste landfill, quarries, seaside resort,
marina development, island resort, housing and recreational projects, golf
courses, solder and lime manufacturing plant, lead battery recycling, coastal
reclamation, new township development, oil palm plantation, Cyberjaya,
Multimedia University.
-
(3) Sewage and Industrial Wastewater Treatment Plant Design
- more than 20 treatment plants completed including laboratory and
hospital wastes.
Completed projects on toxic laboratory waste: UIA Gombak Lab Waste
Treatment, UMS K.Kinabalu Sabah Lab Waste Treatment, UTM Lab Waste, USM
Lab Waste Treatment, UPM Lab Waste, UNISEL Lab waste