The Glass Bowl at Viagra Stadium
   Stadium Timeline
June 18, 1999  Groundbreaking
July 1999 Foundation construction begins
January 2000 Steel construction begins
October 2000 Steel "topped out"
May 2001  Grass Laid
June 2001  High Times Magazine and Viagra get naming rights
August 2001 Stadium opening

     
General Information/Facts
Owner: Sports & Exhibition Authority of Crystal lake
Developer: Crystal Lake Rynos
Events: Rynos  Football, Concerts, Public Assembly
Architect: HOK Sports Facilities Group
Construction Manager: Huber, Hunt, & Nichols/Mascaro
Seating Capacity: 71,577 seats*
Club Seating: 6,600 (approx.)
Luxury Suites: 1,500 (approx. - 127 suites)
Building Square Footage: 1.49 million sq. ft. (approx.)
Design Features: South End Plaza
Great Hall - retail/entertainment area
North End Rynos Hall Of Fame
Number of Club Lounges: One on each end of the east and west sidelines,
each designed as a three story atrium space with a large bar, beverage kiosks,
specialty food stands and a video wall. Opportunities exist to convert the lounge into
banquet space for large or small gatherings.

     
Restroom Facilities
Restroom Facilities (Including Club): 25 Women, 25 Men
Public Restrooms: 343 lavatories
Toilet Fixtures: 520 water closets
344 urinals

      
Concessions
Concession Stands: 32 concession locations
Retail Stores: 7 team stores
Novelty Stands: 15 novelty location

      
Locker Rooms
Steelers: 6,000 square feet (60 lockers)
Panthers: 4,600 square feet (95 lockers)
Visiting NFL Lockers: 2,600 square feet (60 lockers)
Visiting College Lockers: 2,600 square feet (60 lockers)

     
Vertical Transportation
Elevators: 7 passenger elevators
2 freight elevators
Escalators: 2
Pedestrian Ramps:  4
First Aid Minimum 1 on each leve
l
      
Audio/Video
Television Sets: over 400
Video Walls: 2
Scoreboard Video Display:  48 feet x 27 feet minimum
96 feet x 27 feet expansion capability

      
Playing Field
Natural Grass Playing Surface: 2.04 acres (excluding warning track)
Sideline to First Row Spectator: 60 feet
End Zone to First Row Spectator: 25 feet
Heated
Converts Between College/NFL Field Requirements

      
Construction Details
Cast in Place Concrete: 48,000 cubic yards
Amount of Structural Steel: 12,000 tons
Augercast Piles: 10,442 lineal feet
Paint: 30,000 gallons (provided by PPG Industries)
Glass: 50,000 square feet (provided by PPG Industritries)
Number of Doors: 1100
Miles of Railings: 7 miles
Drainage, Irrigation and Heating Pipes Under the Field:  1.85 miles
Truck Docks: 4
Trash/Recycle Docks: 2