Materials gross to net requirements explosion Application determines for any assembly (part number), the quantities of all components needed to satisfy its demand requirements continuing through every sub-assembly untill all purchased and/or raw material requirements are calculated. Application determines component requirements for production schedules of distinct assemblies with common component needs. With given materials cost and standard time data, the application determines the total materials cost and operating personnel requirements of a given production schedule. This application may be interfaced to a manufacturing database server (PostgreSQL, Oracle) to drive and MRP system. Application inputs: Bill of Materials, (independent) demand forecast, current inventory and scheduled receipts, material cost (optional), standard assembly times (optional). |
Material Requirements Planning |