Hisham Yassin Safieh | |||||||||||||||||||
Yahoo! | |||||||||||||||||||
Yahoo! Chat | |||||||||||||||||||
Yahoo! Games | |||||||||||||||||||
Yahoo! Photos | |||||||||||||||||||
Family name : Safieh First name : Hisham Date of birth: 28.02.1952 Nationality : Syrian Marital status :married , 6 Children Languages : Arabic, mother tongue English , fluent Driving license: Issued from U.A.E. Address : P. O. Box: 1065 Al Ain - U.A.E. Al Ain Distribution Company, telephone : 7081426 "office". 7511581 "res. ", 7636335 fax., 0507738626 Mobile. E-mail: hisham36@emirates.net.ae; hys36@yahoo.com ; hishamsafieh@hotmail.com ; hys36@aadc.ae Academic qualifications: From 1969 to 1975: B.Sc. In Mechanical Engineering from Damascus University. Specialization : Production Experiences: From 18/08/2007 up to date: Al Ain Distribution Company, Al Ain, UAE. 500 Employees – Water Asset Engineer, Working with Information Asset Section. From 09/05/2006 up to 17/8/2007: Al Ain Distribution Company, Al Ain, UAE. 500 Employees - Maintenance Planning Engineer, Working with ”CMMMS” Maximo 5.2 software for corrective and preventive maintenance From 28.02.1992 up to 08/05/2006 : Bainounah Power Company , Al Ain UAE ,250 Employees - Mechanical Maintenance Planning Engineer: Working with MAXIMO software as Computerized Maintenance and Materials Management System "CMMMS", work order system for both corrective and preventive maintenance, Preventive maintenance scheme, Purchase requisitions, Contracts, work service orders, follow up, outages coordination, for 428 MW Power Station, including SWD and Sulzer Diesel Engines, GE Frame 5 Gas turbines, ABB F9, Westinghouse and Frame 6 John Brown Gas Turbines. Budget preparation and negotiation, Technical registry follow up for all drawings and manuals of operation and maintenance. From 17.07.1984 to 27.02.1992: General Company For Electrical And Communicational Works "Syrianet" Damascus-Syria. 400 Employees, Maintenance programmer (1 year): Preparation of Preventive maintenance for more then 400 light duty vehicles and more than 250 heavy duty under average 2000 km per vehicle per month, also for more than 400 Equipments, like mobile generators, compressors, Graders, shovels? depending on running hours for each vehicle, all of that for 5 locations of workshops distributed in each city in Syria, plus 5 mobile workshops, especially for very far distance locations. More than 7 years in the same company: I worked as Stores Head Dept.: Supervising 15 storekeepers, contract section, stock control section, Purchase section. Also I have knowledge about ?M.E.S.C,? code utilized originally by Shell Co. From 03.03.1981 to 15.06.1984: Ras Lanuf Oil and Gas Processing Company , Libya , 400 Employees Mechanical maintenance planner: Responsible for preventive maintenance of Oil refinery, Utilities includes Gas turbines, Desalination plants, Water treatment plants and study the spares status for maintenance activities From 03.07.1978 to 14.02.1981: Management Development and Productivity Center , Damascus , Syria 55 Employees. Maintenance Engineer in MDPC :site study and visits for Syrian factories which belong to industrial ministry and train the technical staff about preventive maintenance programs.. From 02.01.1976 to 02.07.1978: Military service as a mechanical maintenance engineer in dry battery factory From 08.09.1975 to 01.01.1976: Management Development and Productivity Center , Damascus ,Syria 55 Employees. Maintenance Engineer in MDPC :site study and visits for Syrian factories which belong to industrial ministry and train the technical staff about preventive maintenance programs Technical courses : From 26.04.1979 to 30.06.1979: Training about : organization and management of maintenance. UNIDO scholarship special course in Stockholm, Sweden From 23 to 27.06.1980: International technical course in Denmark Brül and Kajer co. In the field of :?measurement techniques analysis methods, transducers, electronic instruments, as applied to the study of sound and vibrations. From 22.07.1992 to 01.08.1992: Training course in the field of :"the natural gas reducing system of Al Ain power station"- with Fumagelly Impianti spa.- Italy In 13.02.1992 and in 06.10.93: Two seminars in the field of Euro filter gas turbine filter. Wotek co. In the period : 18.12.1993 to 15.09.2000: Computer course in the fields of windows ,dos , Good knowledge in Foxprow 2.5 , Office 2000,XP and Win Project 98, Help Desk enterprises. Maximo, Training course in Maintenance and Inventory Fields.(CMMMS). Magic Help Desk course In 10.04.94 and 06/03/96 : Lube oil seminar with ADNOC. From 24 to 25 Jan. 1995: Water well drilling seminar with Drilltech inc. ,Sandvik "Rock Tools" , Oil Tools International . John Brown gas turbine type frame 6 : mechanical maintenance course |
|||||||||||||||||||
Chess, Swimming |