![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
||||||||
<<<Back To Home page | ||||||||
17/12/01 - 25/07/02 Chevron Offshore Thailand Co. , Ltd / Worley International Ltd. Position: Offshore Construction Supervisor. Job Description: Inspection of prefabrication and installation of Mercury Removal Platform, Three MR-Vessels (Catalyst Impregnated, Mercury Absorbing, Carbon Pellets), one Oily Water Separator (Crushed Nutshell Filter), one Carbon Particle Filter, pumps and motors. Prefabrication and installation of GRP Piping on the offshore based Oil Tanker. Reason for termination of employment: Project completed! 05/01/01 - 31/11/01 FG Tech Services Co., Ltd. / ECO Service Co., Ltd. Position: Project Enginner / Sales Manager. Job description: Installation of BHP Steel Bulding Products, Signum Fire Protection Systems, and installation of PE lining on new sewer concrete piping. Bringing in customers for Hazardous Waste Management. Company presentation, receiveing samples for analysis, and follow up projects. Reason for termination of employment: Improper permits and certificates! 13/03/00 - 31/12/00 Thai Environmental Service Co., Ltd. Thailand. Position: Safety & Site Manager. Job description: Setting up sfaety department from scratch. Acting as technical support for our sales department. Including clearing scope of work, estimation, bidding and quotation. I was also working on qualification to be certified to ISO -9002, -1401 and SCC (Safety Certificate for Contractors) A presitious certificate required to enter and perform all kinds of work at oil or gas plants! Reason for termination of employment: Offered better conditions! 05/11/99 - 07/12/99 Rieckermann Thai Engineering Co., Ltd. Thailand Position: Feild Supervisor Job Description: Responsible for a team of thai technicians that installed a compressed air piping unit and electrical connections for machinery on a, empty, tuna fish, canning factory. Project responsible for QC, HSE, logistic and pesronnel aspects. Reason for termination of employment: Project completed! 15/04/99 - 15/01/00 Nynas Petroleum AB, Sweden Position: Inspector Job Description: Authority inspection, internal policy inspection of piping, pressure vessels, safety-catches and lifting equipment, to reach planned safety- and accessability- goals. AutoCAD drafting and documentation of NDT and other maintenance inspection activities. Reason for termination of employment: Returned to the expat life! 05/09/97 - 06/06/99 University of Karlskrona / Ronneby, Sweden Position: University Student Job Description: Studying the basic mechanical engineering subjects and a miwture of electrical, electronic, manufaturing, production, environmental foundations and quality control subjects. Rason for termination of employment: Examination 23/09/96 - 15/05/97 Marine Weld A/S, Norway Position: Combination Worker Job Description: Repair and commissioning of Esso and Statoil drilling and pre-refienry oil tankers (FPU). Mostly correction of steels tructure, piping and equipment installations. Reason for termination of employment: Project completed and went to complete my University degree! 10/01/96 - 12/07/96 KSS Engineering and Construction Co., Ltd., Thailand Position: Construction Mananger Job Description: Planning the size of and hiring the workforce. Pipe preparations, spool prefabrication, site erection, weekly progress reports, S- curve, weekly QC meetings with the client and their US consultant Stone & Webster, Houston. 03/07/95 - 20/10/95 Hitachi Zosen Corp. Thailand Job description: Responsible for overall piping installation on the expansion project of a gas separation plant. Co-ordinating subcontractors on U/G piping firefighting facilities, oily water sewer systems, process area A/G piping on the ecpansion and tie-in to the existing plant! |
||||||||
![]() |