| Project to repair the water tower in the village of Yantalo, near Moyobamba - February - March 2004. |
|||||||||||||||||||
| The inside of the tank, recently resurfaced with cement (the surface will also be coated with an impermeable paint). | |||||||||||||||||||
| Architect Samuel and Engineer Liliana climbing the tower. |
|||||||||||||||||||
| Architect Samuel (a brother from a local church), who is directing the work. | |||||||||||||||||||
| The view from the top of the tower. | |||||||||||||||||||
| The new galvanized iron ladder (from mid-way up), which replaces the old corroded one. An additional concrete platform was built to "break" one of the lengths of the ladder. | |||||||||||||||||||