Project to repair the water tower in the village of Yantalo, near Moyobamba
- February - March 2004.
The inside of the tank, recently resurfaced with cement (the surface will also be coated with an impermeable paint).
Architect Samuel and Engineer Liliana
climbing the tower.
Architect Samuel (a brother from a local church), who is directing the work.
The view from the top of the tower.
The new galvanized iron ladder (from mid-way up), which replaces the old corroded one. An additional concrete platform was built to "break" one of the lengths of the ladder.
1