| Launching Dustspeck | ||||||||||||||||||
| With a successful voyage completed, I turned to the task of finishing Dustspeck. This ended up taking longer than the construction! First I had to finish installing the decks. |
||||||||||||||||||
![]() |
||||||||||||||||||
![]() |
||||||||||||||||||
| No sooner had the epoxy coating dried than I got an invitation to go paddling with the ScuzBums in South San Diego Bay. I couldn't wait. The epoxy made the hull waterproof and one day of sun exposure wouldn't hurt anything. The full story of my launch day adventure was published in Duckworks Magazine. |
||||||||||||||||||
| The decks were made from scrap 3mm luaun door skins. I didn't have a big enough piece to cover the whole end so I used two smaller pieces... | ||||||||||||||||||
![]() |
||||||||||||||||||
![]() |
||||||||||||||||||