Plans required in dry dock

For dock master:

bullet Docking plan.
bullet Cargo stowage plan (If docking with cargo).
bullet Reports from last dry dock.

 

Following plans to be kept ready:

bullet Fire plan.
bullet Midship section plan.
bullet General arrangement plan.
bullet Capacity plan.

 

 

 

Contents of a docking plan:

bullet Position of bulkheads
bullet Position of main structural members.
bullet Rise of floor (if any).
bullet Position of plugs.

 