NOHN PAGES
SEABIRD´86 BUILDING  STEP 2

THE NEW WORKSHOP 

To got an adequate workroom, there was only one possibility: push down this old shed and build an new garage were I can build my boat. Now I hope there will be enough space. 

When the Seabird will be ready this place will serve as a fine garage for my brothers car.

What a nice surprise: in the shed was a lot of very old, good ash wood.
I´ve made some special pieces for the boat from it.

.Bootsbau ohne Garten

seabird original
seabird modified version

building steps
building step 1   Model
building step 1a more model pictures
building step 2   The new workshop
building step 3   Preparations
building step   Keel & Bottom
building step 5   Horn assembly
building step   Bulkheads & Transom
building step 7   Hardware & Vents
building step   Stringers & Clamps
building step 9   Rudder
building step 10 Side panels & Bilge panels
building step 11 Main sheer moldings & windows
building step 12 Tabernacle posts
building step 13 Deck
building step 14 Cockpit

miscellaneous
going around the boat
breakdowns
scarfing tool
load handling

links
seabird ´86 index
back to top
mailto: nohnmusik@gmx.de