NOHN PAGES
SEABIRD´86 BUILDING STEP 3 

Preparations

Here you see some presawed ash-wood pieces from the old shed. Obviously my friends and me had a lot of fun (mostly). The new workroom wasn't ready this time and so I build some special pieces: first seabirds stem some weeks later the mould for the lead.

.Bootsbau ohne Garten

seabird original
seabird modified version

building steps
building step 1   Model
building step 1a more model pictures
building step 2   The new workshop
building step 3   Preparations
building step   Keel & Bottom
building step 5   Horn assembly
building step   Bulkheads & Transom
building step 7   Hardware & Vents
building step   Stringers & Clamps
building step 9   Rudder
building step 10 Side panels & Bilge panels
building step 11  Main sheer moldings & windows
building step 12  Tabernacle posts
building step 13  Deck
building step 14  Cockpit

miscellaneous
going around the boat
breakdowns
scarfing tool
load handling

links
seabird ´86 index
back to top
mailto: nohnmusik@gmx.de