PROJECT
EXPERIENCE (PAGE 3)
Continue List
client
|
field
/ facility |
pel’s
scope/ project brief |
DATE
|
MANHOURS
|
PDC-EAST
|
Afam
GasPlant and Flowstation Rehabilitation Design Works
|
Basic
Engineering and Detailed Design for the proposed rehabilitation and
upgrade works for the GasPlant and Flowstation facilities within the
perimeter/boundary limit of the plants. |
Nov.
2002 |
10,000
|
SPDC-EAST
|
6 Land and 5
swamp Flow stations |
Preparation
of Operating and Maintenance Manual for 11 flow stations /
production facilities. |
Oct.
2001 |
7,450
|
SHELL GAS
NIG. LTD. |
OTA GAS
PLANT |
Preparation
of Operating and Maintenance Manual for the pressure reduction and
gas distribution station. |
Dec.
2002
|
2,200
|
SPDC-EAST
|
Agbada
Field |
Detailed
Design of Agbada Remote Field Manifold (RFM) at Location 20 and
Bulkline to Agbada 2 Flowstation. |
Nov.
2002
|
1,950
|
SPDC-EAST
|
Cawthorne
Channel AGG Pipeline Project |
Complete
detailed design and engineering survey work including soil test /
analysis, soil resistivity study, corrosion engineering etc for
eleven (11) low and high pressure pipelines in the swamp terrain and
major river / creek crossings. |
May-Nov.
2001 |
28,390
|
SPDC-EAST
|
5 swamp
Flowstations |
Preparation
of Operating Manual for flow station / production facilities for a
total of 5 Fowsatations |
Oct.-Dec.
2001 |
6,750
|
|