Project | Client |
Bojonegara Gas Station Process Design ..Dec 2006 (Finished) |
PT Elnusa |
Karebbe Water Supply Process Design ..Dec 2006 (Finished) |
PT Inco |
Butadiene Spherical Tank Process Design ..Dec 2006 (Finished) |
PT Gajah Tunggal |
Fuel Oil Complex Process Design for PLTU Rembang 2x300 MW..Jan 2007 (finished) |
Zelan (Malaysia) |
Coal and Limestone Handling design for Gasifier Project.. Jan 2007 (Finished) |
IHI (Japan)/JEL (Sgp) |
Fire System design for Gasifier Project..Jan 2007 (Finished) |
IHI (Japan) / JEL (Sgp) |
Fire System design for Fuel oil Complex PLTU Tj Jati 2x300 MW..Jan 2007 (Finished) |
Mitsubishi Heavy Industry (Japan) |
Fire System, 3500 m3/day Waste Water Treatment and 15 m3/hour Drinking Water Plant design for Cintamanis Sugar Plant (South Sumatra).. Feb 2007 (finished) | Salim Group & Fives_Cail (France) |
Fuel oil complex, Fire System design and Water/waste water treatment plant for Keban Agung Power Plant 2 x 100 MW (South Sumatra)..Feb 2007 |
Zelan (Malaysia) |
Fire System Design for Sarulla Geothermal Power Plant 100 MW (NIL & SIL area in North Sumatra)..Feb 2007 (Finished) | Medco Energy + Ormat |
Re-alocation KEROSENE tank as PERTAMAX di depot Cikampek.. Mar 2007 (proposal is finished) | PERTAMINA UPPDN III |
Karebbe Fire Protection System (Main Camp and Office),..Mar 2007 (finished) | PT Inco |
M.B.E uranium reactor (irradiation) feed and product handling design..April 2007 | Puspitek (Indonesia technology research center) |
Fire System design for PEMATANG, Duri Pekanbaru..April 2007 (finished) | PT Chevron Pasifik Indonesia |
Fire System design for 10,000 Ton Cement Bulk Storage, Jakarta..April 2007 (finished) | PT Boral Indonesia (Jaya Group) |
Dipasena revitalization project (17,000 units shrimp pond + power plant)--Budgetary ..May 2007 | PT CP bahari + Truba Alam Manuggal |
Water & Waste Treatment system and Fire system for PLTD Bontang 3 x 5 MW ....May 2007 | PT PLN |
MFO (400 cst viscosity) Pump system design for Muara karang Power plant..May 2007 | PT PLN |
Tambun project (Stage2) , 4 tanks + 2 Transfer pumps + Fire system..May 2007 | PT PERTAMINA (DOH Cirebon) |
30 m3/hour Water Treatment Plant and Fire system design for Power House at Dipasena's Revitalitation Project in Lampung..June 2007 | CP Bahari |
Proposed system design for 4 x 10,000 m3 GASOIL Terminal | TBA |
Provide product design such as : 1. Basis Design : Compliance Client Requirement and Standard design, Making clear battery limit condition for avoiding different perception between Client and Contractor and How system works that have strong relation with design philosophy.
2. Process Flow Diagram : Process Description in Drawing.
3. Piping and Instrumentation Diagram : Line sizing, pipe schedule and fitting rating, and Control philosophy in Drawing.
also,
Provide Training such as : 1. Process Design Knowledge : Giving effective information to Know How about the process engineer do. 2. Fire system Design Knowledge : How to design of fire system such as : Spraying system design, Foaming system design, Fire pump system design, Fire extinguisher placement, and Safety design for Plant equipments. Easy and friendly.
3. Fuel Terminal Tips and Trick effective Design : Giving some cases in Fuel terminal wrong design and how to improve it so, It's a Great experience. |
|
Contact Us : Email : rigun@telkom.net Phone : +628129591518
|
Last Update : 30/06/2007 05:37:54 |
|
|