Ibnu D. R Website

About Me Literature white_word Truba Email News


Project Client

Bojonegara Gas Station  Process  Design ..Dec 2006 (Finished)

 PT Elnusa

Karebbe Water Supply Process Design ..Dec 2006 (Finished)

 PT Inco

Butadiene Spherical Tank Process Design ..Dec 2006 (Finished)

 PT Gajah Tunggal

Fuel Oil Complex Process Design for PLTU Rembang 2x300 MW..Jan 2007 (finished)

 Zelan (Malaysia)

Coal and Limestone Handling design for Gasifier Project..

Jan 2007 (Finished)

 IHI (Japan)/JEL (Sgp)

Fire System design for Gasifier Project..Jan 2007 (Finished)

 IHI (Japan) / JEL (Sgp)

Fire System design for Fuel oil Complex PLTU Tj Jati 2x300 MW..Jan 2007 (Finished)

 Mitsubishi Heavy Industry (Japan)
Fire System, 3500 m3/day Waste Water Treatment  and 15 m3/hour Drinking Water Plant design for Cintamanis Sugar Plant (South Sumatra).. Feb 2007 (finished)  Salim Group & Fives_Cail (France)

Fuel oil complex, Fire System design and Water/waste water treatment plant for Keban Agung Power Plant 2 x 100 MW (South Sumatra)..Feb 2007

 Zelan (Malaysia)
 Fire System Design for Sarulla Geothermal Power Plant 100 MW (NIL & SIL area in North Sumatra)..Feb 2007 (Finished)  Medco Energy + Ormat
 Re-alocation KEROSENE tank as PERTAMAX di depot Cikampek.. Mar 2007 (proposal is finished)  PERTAMINA UPPDN III
 Karebbe Fire Protection System (Main Camp and Office),..Mar 2007 (finished)  PT Inco
 M.B.E uranium reactor (irradiation) feed and product handling design..April 2007  Puspitek (Indonesia technology research center)
 Fire System design for PEMATANG, Duri Pekanbaru..April 2007 (finished)  PT Chevron Pasifik Indonesia
 Fire System design for 10,000 Ton Cement Bulk Storage, Jakarta..April 2007 (finished)  PT Boral Indonesia (Jaya Group)
Dipasena revitalization project (17,000 units shrimp pond + power plant)--Budgetary ..May 2007  PT CP bahari + Truba Alam Manuggal
Water & Waste Treatment system and Fire system for PLTD Bontang 3 x 5 MW ....May 2007  PT  PLN
MFO (400 cst viscosity) Pump system design for Muara karang Power plant..May 2007  PT PLN
Tambun project (Stage2) , 4 tanks + 2 Transfer pumps + Fire system..May 2007  PT PERTAMINA (DOH Cirebon)
30 m3/hour Water Treatment Plant and Fire system design for  Power House at Dipasena's Revitalitation Project in Lampung..June 2007  CP Bahari
Proposed system design for 4 x 10,000 m3 GASOIL Terminal  TBA

 

Provide product design such as :

1.  Basis Design : Compliance Client Requirement and Standard design, Making clear battery limit

    condition for avoiding different perception between Client and Contractor and How system works that

    have strong relation with design philosophy.

 

2.  Process Flow Diagram : Process Description in Drawing.

 

3.  Piping and Instrumentation Diagram : Line sizing, pipe schedule and

     fitting rating, and Control philosophy in Drawing.

 

also,


 

Provide Training such as :

1. Process Design Knowledge : Giving effective information to Know How about the process engineer do.

2. Fire system Design Knowledge : How to design of fire system such as : Spraying system design, Foaming     

    system design, Fire pump system design, Fire extinguisher placement, and Safety design for Plant equipments.

    Easy and friendly.

 

3. Fuel Terminal Tips and Trick effective Design : Giving some cases in Fuel terminal wrong design and how to

    improve it so, It's a Great experience.

 
 

Contact Us :

Email : rigun@telkom.net

Phone : +628129591518

 

If you have a process design project and need an inexpensive price,contact us now..

 

 

 

Last Update : 30/06/2007 05:37:54