PROFESSIONAL EXPERIENCES |
From Dec. 2001 To Date : Technical Engineer at The Arab Contractors Chairman's Office-EGYPT. From Apr. 2000 To Nov. 2001 : Planning Engineer, Quantity Surveyor and Workshop drawer at Samsung-Arab Contractors Joint Venture at Project of Extension of Grain Berth No.13 at Damietta Port-EGYPT From Feb. 2000 To Apr. 2000 : Site Engineer at The Arab Contractors- Roads Dept. paving Al-Ouroba Street Project -Cairo. From Sep. 1999 To Feb. 2000 : Technical Engineer at The Arab contractors-Egypt Roads Dpt. Studying and estimating the tenders From Oct. 1998 To Aug. 1999 : Technical Engineer at The Arab Contractors Ghana Ltd. - Ghana Technical Engineer at Kumasi Drainage Improvement Works Project, Kumasi - Ghana Form Jan. 1996 To Oct. 1998 : Technical Engineer at The Arab contractors-Egypt Roads Dpt. Studying and estimating the tenders |
AS A PART-TIME ENGINEER |
From Nov. 1996 To Oct. 1998 : at Consultants for Investigation and Design Office From Sep. 1999 To Apr. 2000 Cairo-EGYPT. Preparation the Details of the reinforcement (Workshop Drawings, cut length and Quantities) For the Capping Beams-Platforms of The Greater Cairo Metro Line No. 2 Phase No. 2 - Cairo University Station And, Structural Design for some Factories, Tall Buildings, Hotels (such as Meridian Sharm El- Shekh Hotel) and Villas at (Cairo, Mansoura, 6 October, Al-Oubour and Aswan) From Oct. 1994To Dec. 1995 : at Dr. Eng. Hammed Asker Office Mansoura - EGYPT Structural Design for some Hospitals & Tall Building |