V.Umashanker
Blk-308,
#03-339,
Clementi
Ave-4
Singapore-120308.
Phone
no: 65-68731032 (home)
65-62625949(Office)
Email : v_umashanker@yahoo.co.uk
Professional Highlights:
Mechanical engineering
disciplines in the Petrochemical,Tankage, Refinery, Marine and Offshore
industries.Cad piping Design expertise and exposure to interfacing disciplines.
Have the ability to gather field data, prepare layouts and finished drawings in
all phases of piping designs including checking, plant layouts, bid packages
and project lead designer from conceptual studies to final design and
as-builts.
Tenure : 7
years (from 13.04.96 to 31.03.98 &
26.04.2000 to till date)
Name
of the company : AUDEX PTE LTD
Designation : Piping
Engineer
Audex Pte Ltd as a joint venture company
between Chiyado Singapore (Pte) Ltd
and Plant Engineering Construction Pte
Ltd. This company of excellence provides Engineering & Construction
expertise for Oil & Gas, Power plants etc.
June '04 to
Unocal Bangladesh,Moulavi Bazar Gas Plant Development
till date
Consultant :
C-Engineering and Intergrated
services,Western Australia.
Design and development of
4 Nos fixed cone roof tanks(10.3Dia X 6.0m H)
Mar'04 to Lien Hwa Cryogenic Equipment Corp.(Taiwan)
June '04 Development
of 8000M3 (20.7m dia X 24.0m H) Doom roof
Double
wall tank for storage of Liquid Nitrogen (-196 deg c).
Oct'03 to CAFHI - Changi Airport Fire
Hydrant Installation Pte Ltd
Mar '04 Consultant
: BP Australia Pty Ltd, Queensland.
Design piping facilities for
2x10,000Kl Jet-A1 storage tanks at Changi
Airport(Singapore).
·
Feasibility studies.
·
Route selection studies,
·
Material selection studies.
·
Preparation of Piping Specifications.
·
Preparation of pipeline design basis.
Apr'03 to OilTanking Terminal - Sakra Island, Singapore.
Oct'03 Additional 5 Nos of pigging lines
from trucking loading bay to hose pit.
·
Pipeline sizing studies, wall thickness calculations.
·
Design of pig launcher and pig receiver stations.
·
Preparation of material specifications and
requisitions.
·
Preparation of construction scope of work and
specifications.
·
Preparation Line List
·
Preparation of Tie-in list
Mar’03 Singapore
Syngas Pte Ltd
·
Stress analysis (Simplex II Software). Exposer to
Ceaser II
·
Review of P&ID’s.
·
Preparation of cost estimates
Jan
’03 to Croda Singapore Pte
Ltd
Mar’03 Eastman
Chemical Ltd.
·
Preparation of planning schedules.
·
Construction supervision.
·
Operating and maintenance manuals.
·
Preparation of as-built drawings.
Jan’02
to Grootint GRP Systems B.V
- Holland
July’02 Design
and prepare drawings for supports (Upto DN2400) for GRP pipes.
Jan’01 Design
piping drawings for all systems used in sereya power plant
Jan ’01 Designing 2 nos of 10” cross country pipeline carrying O2 and N2
·
Tie-in design.
·
Preparation of route maps and alignment sheets.
· Preparation of detail drawings.
Tenure
: 15.04.98 to April 2000
Name
of the company : KEPPEL
SINGMARINE DOCKYARD
PTE LTD.
Designation : Technical
Officer(Engineering)
Tenure
21.11.94
to 10.04.96
Name
of the company : DCM HYUNDAI LTD.(Korean MNC)
Designation : CAD
– Design assistant
Tenure
:
15.10.93 to 16.11.94
Name
of the company : M/s Esquire engineers &
Consultant.
Designation : Cad
draughtsman
Education Qualification
Operating
systems : Windows,
Linux
Cad
Package : All release upto Autocad 2002, Cad
Overlay
Programming
Language : C,
Visual Basic, Java 2
Multimedia : Adobe
Photoshop, Dreamweaver,
Director 8.
Database : Oracle
8, Sql Server.
Father’s Name : P.Vijayan
Date of birth & age : 19.06.1975, 29 yrs
Marital status : Married
Languages known : English,
Tamil, Telugu
Interest & hobbies : Swimming, reading.
Passport No : Z1318786
Date of issue & expire : 09-01-2004 & 08-01-2014.
Availability to join : 1
˝” month from the day of confirmation