Meeting:
Columbian House Residents
Date:
Attendance: Ken McQueen (principle) Sheila Morris (executive assistant), Roger Moors
(VST Properties Trust), Basil ( Project manager ) residents: Alan Akehurst (3034), Frances Brown (3023), Christine Conkin (3026), Debra Faulk (3036- recorder), Mary Fontaine (3022), Carmen Lansdowne (3011), Mary Lynn Siwallace (3024), Sharon Swanson (3025), Oklan Yoon (3011),
Purpose:
To inform residents of schedule of construction. To hear and respond to
Resident’s concerns.
A
preliminary construction schedule was handed out and reviewed.
·
The fence that will be constructed around the
underground parking excavation and student residence construction site will
also have a plastic liner for both visual privacy and slight cut down of dust.
·
Trees marked with red “X” will come down week of
Sept. 29th – Oct 3rd including 2 weeping birch in front
of Columbian House.
·
Excavation truck route will be via
·
Bulk of the excavation will take 3 weeks beginning
on or around Oct. 6th – this will be the noisiest sustained work
Resident’s
Concerns (response in italic)
Parking
lot/exterior lighting ~ parking lot
lights ought to be working, Roger will check
with UBC – Martin Paradis (site manager contacted D. Faulk Sept. 26th
to
confirm that he will address this
issue)
Advance
Notice – specifically with regards to
requested action (eg moving cars) ~ this
concern was noted with recognition
of the need for increased all round communication
Privacy
– residents will need to be aware of the
fact that workers will be around; see note
above re fencing
Gardening
– where can we plant/replant that will be safe ~ the north side of Columbian is
a safe place.
Any plant from old principle’s house property are there for the taking and if
wanted need to be taken in the next week or so.
Soil
– is anything being added to it that is dangerous ~ nothing is being specifically added
Trees
– concern about stability ~ trees of
concern will be cut down next week.
Visitor
Parking ~ spots closest to
available as of 3/10); designated
spots by the portables; 3 spots in front of principals house
Pathway
onto UBC campus via backdoor ~ will be
putting in a new staircase for the back door
and will assure access to UBC
campus & Chancellor Bldg. Via Military Rd. & St.Andrew’s
Lane.
Construction
start times ~
Discounts
in housing charge because of interruptions ~ not addressed
**
Sept. 26th call with Martin also spoke about a place for Julia Varga’s (3012) scooter