RESEARCH
PROJECTS |
CONSULTANCY |
Title of the Project |
Sponsoring Agency |
Sponsoring Agency |
Project Value (Rs in Lakhs) |
1 |
Design & Development of a Longitudinal
Wave Beach
System for a High Speed Towing Tank |
Defense Research & Development
Organization |
2.0 |
2 |
Design & Development of a Transverse
Wave Absorber System for a High Speed Towing Tank |
-do- |
2.0 |
3 |
Design of Fisheries Harbour |
Gopalpur Port Project |
1.3 |
4 |
Design of Approach Trestle |
-do- |
3.0 |
5 |
Weather Window for Tamilnadu Coast |
Oil & Natural Gas Commission,
Madras |
0.12 |
6 |
Numerical Modelling and Flume Investigations
for Pipavav Port,
Gujarat |
Larsen & Toubro Ltd., Bombay |
5.0 |
7 |
Study of Wave Characteristics in Ravva
Field of K.G.Offshore |
O.N.G.C., Madras |
0.40 |
8 |
Design of Sea Water Intake System |
Birla Periclase, Visakhapatnam |
10.5 |
9 |
Extension of Haddow Wharf |
Andaman Harbour Works |
4.0 |
10 |
Spencer 's Aquaculture Project
|
Spencer 's & Co |
1.15 |
11 |
Design of Sea Water Intake System
at Naripaiyur |
Entoma Hydro Systems, Madras |
2.0 |
12 |
Development of Colachel Port |
Govt. of Tamilnadu, Tamilnadu Port
Development |
9.1 |
13 |
Design for Diffusor System |
ABAN Constructions |
0.30 |
14 |
Development of All Weather
Port at Gopalpur |
Tata Iron & Steel Co. Ltd. |
1.0 |
15 |
Sea Water Intake |
Gopalpur Port Project |
1.0 |
16 |
Design of Deep Water Berth |
Gopalpur Port Project |
5.0 |
17 |
Potential Sites along Orissa Coast |
Government of Orissa |
0.75 |
18 |
Dredging Chilka Mouth |
Chilka Development Authority |
1.0 |
19 |
Master Plan for Gopalpur |
TISCO |
1.0 |
20
|
DRP for GMB Port
at POSITRA |
FRH
|
8.0 |
21 |
Wave Flume Studies for Breakwater
Section/Round Heads Proposed for Jaigad, Agargule, Vijaydurg & Redi
Ports. |
NIO, GOA |
10.0 |
22 |
Analysis of Sea Water Intake System
for Kovaya, Gujarat. |
LARSEN & TOUBRO LTD. MUMBAI |
1.5 |
23 |
Behaviour Changes in Pulicat Backwaters. |
NMTPP TNEB, ENNORE, MADRAS |
4.25 |
24 |
Off shore feed stock handling facility
for PP/PE Plant - North of Kakinada. |
M.K.R. Industries Ltd. Secunderabad
|
3.5 |
25 |
Studies on tidal effect in Adyar
River |
ESKAY DESIGNS, Madras |
4.15 |
26 |
DPR for Nagapattinam Port |
TNPD, Chennai |
7.5 |
27 |
DPR for Cuddalore Port |
TNPD, Chennai |
7.5 |
28 |
DPR for Vallinokkam Port |
TNPD, Chennai |
10 |
29 |
Stability Analysis of Composite Breakwater
at Mormugao Port
|
Mormugao Port Trust, Goa |
10 |
30 |
Construction of Mini Fishing
Harbour at Muthalapozhi - Numerical
Model Studies |
Harbour Engineering Department, Thiruvananthapuram |
8.0 |
31 |
Amba Creek Crossing - Request for
Calculations for Floatation and Buoyuancy. |
ABAN Constructions, Chennai. |
0.30 |
32 |
Design of Diffuser Support System
for Jam Nagar |
ABAN Constructions,
Chennai |
0.50 |
33 |
Numerical Modeling for Tranquility
Studies for Rameswaram Fisheries Harbour |
Fisheries Department, Chennai |
3.5 |
34. |
Construction of 25 MLD Capacity Sewage
Treatment Plant at Visakhapatnam |
Municipal Corporation, Visakhapatnam. |
6.5 |
35. |
Feasibility report for proposed Fishing Harbour at Veerapandiapattinam
in Tuticorin |
Fisheries Department, Chennai |
5.0 |
36. |
Breakwater Flume Studies of Thangassery Fishing Harbour |
Harbour Engg. Dept.
Thiruvananthapuram |
7.0 |
37. |
Barge Mounted Power Plant at Mangalore |
Encon Services Pvt. Ltd. Chennai |
0.75 |
38. |
Model Testing of Breakwater Cross Section for Muthalapozhy Fishing Harbour |
Harbour Engg. Dept.
Thiruvananthapuram |
2.5 |
39. |
Seawall - North of Madras Harbour |
Kampsax Industries, Chennai |
3.75 |
40. |
Ennore Manali Road Improvement Project -Additional Surveys
and Numerical Modelling |
Kampsax Industries, Chennai |
7.00 |
41. |
Numerical model studies for Rameswaram Fishing Harbour |
IHH ,Poondi |
1.25 |
42. |
Sea water intake well and jetty of Simhadri Power Plant of NTPC |
Navayuga Engg. Co. Ltd., Visakhapatnam |
1.0 |
43. |
Coastal Erosion Protection at Outer Wheeler Island |
DRDO, New Delhi |
8.25 |
44. |
Minor Fishery Harbour at Harwood Point, Kakdweep Dist.-
Model Studies |
West Bengal Fisheries Corporation Ltd., Calcutta |
4.5 |
45 |
Model study for effluent disposal pipeline at simhadri make up water
system |
Navayuga engg. Company ltd |
5.5 |
46 |
Bathymetry survey for Arcottuturai, Tamilnadu |
Dept. of Fisheries, Govt of Tamilnadu |
2.3 |
47 |
Bathymetry survey for Portonova, Tamilnadu |
Dept. of Fisheries, Govt of Tamilnadu |
1.5 |
48 |
Bathymetry survey of punnakayal, Tamilnadu |
Inst. Of Hydraulics & Hydrology, Poondi |
2.25 |
49 |
Sea Erosion on the north of Sriharikota Island Andhra Pradesh |
Dept. of Space |
6.0 |
50 |
Hydrodynamic Performance of Geobags protected by Rip-Rap layer |
Garware Wall Ropes Ltd, Pune |
3.04 |
51 |
Anti Sea Erosion work coastline north of Royapuram Fishing Harbour
Near Ennore |
Public Works Dept, Govt. of Tamilnadu |
6.0 |
52 |
Construction of a Fishery Harbour at Mahe, Pondicherry state. |
Government of Kerala, Harbour Engineering Department, Thiruvananthapuram. |
4.5 |
53. |
Sea Protection works along Ennore Expressway. |
Tamil Nadu Road Development Company Limited, Chennai. |
3.5 |
54. |
Model Study, Wave Flume Study under normal and storm conditions. |
Afcons Infrastructure Limited, Mumbai. |
6.5 |
55. |
Bathymetry survey and Numerical model study for periakadu groin work. |
Water Resource Organisation, PWD, Madurai |
6.0
|
56. |
EIA Report for Jetty at Bassein Port |
Good Earth Maritime Limited, Chennai. |
1.5 |
57. |
Pre cast concrete blocks for use in Marine Envivonment in the Breakwater
at the Outer Arm and East Qudy at Chennai Port Trust. |
Chennai Port Trust,
Chennai. |
2.5 |
58 |
Mudslides studies & Engg analysis for submarine pipelines in
KG Offshore area |
IEOT, Oil & Natural gas Commission, Maharashtra |
15 |
59 |
Hydrographic survey of Nizampatnam |
Good earth Maritime Ltd |
2.75 |
60 |
Improvement schemes for keeping the
mouth of river Kuantan, Malaysia open |
Perunding Bakti, Kualalumpur, Malaysia (for Dept. of Irrigation,
Govt. of Malaysia) |
75,000 Malaysian dollars |
61 |
Construction of a fishery harbour at Cheruvathur Model Studies |
Government of Kerala, Harbour Engineering Department, Thiruvananthapuram. |
3.75 |
62 |
Model studies for the proposed fishery harbour at Chettuvai |
Government of Kerala, Harbour Engineering Department, Thiruvananthapuram. |
3.65 |
63 |
Vizhinjam fishery harbour project Siltation on the mouth of Wharf
at Vizhinjam. |
Government of Kerala, Harbour Engineering Department, Thiruvananthapuram. |
15,000 |
64 |
Suggesting comprehensive plan and design by conducting mathematical
and physical model studies for the minor commercial and fisheries
harbours in Karnataka state. |
Government of Karnataka, Department of Ports & Inland Water Transport |
5.00 |
65 |
Development of adequate road connectivity to Chennai and Ennore port – sea protection work – Hydrographic
surveys |
RDS Project LTd, Chennai |
4.5 |
66 |
CPCL-5.8 MGD Desalination project at Ennore -Engg. Related to intake well with pumphouse and jetty. |
Chennai Petroleum Corporation Limited, Chennai |
1.47 |
67 |
Off-shore pipe protection for GIDC Effluent pipeline. |
Larsen & Toubro Limited, Chennai |
Rs.12,000 |
68 |
Tamilnadu sea coast –Effect of Tsunami –proposal for construction RMS walls/groynes/retaining walls-consultancy
services |
Public Works Department, Chennai |
3.59 |
69 |
Construction of a groyne field –numerical studies and site survey at Chennai Port |
Chennai Port Trust, Chennai |
9.37 |
70 |
Numerical modeling studies at Impound for dock off Tekra |
Kandla Port Trust, Gujarat |
19.6 |
71 |
Model studies for minor fishery harbour at Harwood point, West Bengal |
West Bengal Fisheries corporation ltd., Kolkata |
3.58 |
72 |
Extension of South Breakwater –Model studies |
Paradip Port Trust, Orissa |
9.37 |
73 |
Shore protection works –numerical model studies |
Paradip Port Trust, Orissa |
7.16 |
74 |
Development of fishing harbour at Chellanam in Ernakulam district –model studies |
Government of Kerala, Harbour Engineering Department, Thiruvananthapuram. |
1.76 |
75 |
Off-shore pipe protection for GIDC Effluent pipeline |
Larsen & Toubro Limited, Chennai. |
Rs.26,004 |
76 |
Construction of Ettikulam fish landing centre in Kannur district –model studies |
Government of Kerala, Harbour Engineering Department, Thiruvananthapuram. |
1.65 |
77 |
Development of fishery harbour at Arthungal –Model studies |
Government of Kerala, Harbour Engineering Department, Thiruvananthapuram |
1.88 |
78 |
Shore Protection Works along Ennore Expressway, Chennai –Design of shore protection measures between groyne field 1 &
2 |
Tamil Nadu Road Development Company Ltd. |
2.75 |
79 |
Bathymetry survey and numerical modeling for the construction of groin at Periyathalai |
WRO, PWD, Korapallam Division. |
5.0 |
80 |
Rock Dredging at Visakhapatnam Port Trust |
Dredging Corporation of India Limited, Visakhapatnam |
10.70 |
81 |
EIA Study for fishing harbours at Anthervedipallipalem |
Animal Husbandry, Dairy Development & fisheries Dept., Govt of A.P., Hyderabad. |
3.30 |
82 |
EIA Study for fishing harbours at Nizampatnam |
Animal Husbandry, Dairy Development & fisheries Dept., Govt of A.P., Hyderabad. |
3.30 |
83 |
Repairing the damaged slipway Redesigning the structure at Chennai fishing harbour |
Chennai Port Trust |
3.30 |
84 |
Fisheries-Improvement of Pondicherry fishing harbour-preparation of feasibility report for the proposed construction of quay in the existing fishing harbour,
Thengaithitte, Pondicherry |
Govt. of Pondicherry Dept. of Fisheries and Fisherman welfare Botanical Garden Premises, Pondicherry |
5.51 |
85 |
Science, Technology & Environment Dept.,
Thiruvananthapuram
|
Govt. of Pondicherry Dept. of Fisheries and Fisherman welfare Botanical Garden Premises, Pondicherry |
3.30 |
86 |
Construction of revetment for control of erosion on the eastern side of east quay in Chennai Port – Conducting flume test on model. |
Chennai Port Trust
|
1.65 |
87 |
Erosion at Minor Fishing Harbour at Sultanpur |
West Bengal Fisheries Corporation Ltd.
|
1.65 |
88 |
Coastal Protection Works – Construction of Groyne at Ratchagar Street in Kanyakumari – Conducting bathymetry survey and numerical modeling studies. |
Public Works Department, Nagercoil.
|
4.96 |
89 |
Ennore Port Expansion Proposals-Environment Clearance - Advisory assistance for conducting study. |
Ennore Port Limited.
|
10.02 |
90 |
Bid preparation of Design and construction of breakwaters for the proposed Port facility at Karaikal.. |
RDS Project LTd, Chennai
|
1.92 |
91 |
ISTK-1-Seawater Intake, outfall & product water conveyance system of CPCL project, Manali, Chennai-system study including computer based CFD analysis for intake sump. |
Navayuga Engg. Company ltd
|
2.25 |
92 |
Dispersion of high saline discharge studies for Chennai Water Desalination Ltd. |
Madras Research Centre of Central Marine Fisheries Research Institute.
|
4.90 |
93 |
Government of Kerala-H.E.D.-Road from Eravipuram-Paravoor in Quilon District-Numerical study |
The Chief Engineer, Govt.ofkerala,Harbour
Engg.Dept,
Thiruvananthapurm.
|
3.30 |
94 |
Protection of Karaikal Coast |
Irrigation and Public Health Division, Karaikal
|
22.04 |
SPONSORED |