Alpha Tower Notes... |
Notes : The cyan floor is the ground floor. The top of the building is not occupied, the top floor being shown in the map. The red shafts are the service and subbasement lifts. The green shaft is the subbasement stairs. The small cyan lines are the air duct system for the sub basement level. The yellow boxes are hte door for the sub basement levels rooms. Room descriptions are not available in the plans The large red tube running along the 6th underground floor is the Subway, S6 is the subway level. It can be assumed all three sublevel labs are identical. |