![]() |
![]() |
![]() |
---|
MARCH 2007 |
< PREVIOUS > | < NEXT > |
07-Mar-2007: Returning to work after holidays with the family, I cut and place the closet shelves of the aft room. | 07-Mar-2007: Also I place the vertical supports of the back of the aft room entrance seat, and its respective shelves. |
07-Mar-2007: I has already cut the front of closet, so now and after looking several ships (included Cabinho's boat), I mark the places where I will make the openings. |
07-Mar-2007: This dissolvent can has the fair radio!! Sometimes I use what one has by hand!!. | 07-Mar-2007: Finally all the openings ready. |
07-Mar-2007: Presenting the front in their place. It can be appreciated that a lot of space exists to keep things. |
12-Mar-2007: View through aft window. All interior was impregned with epoxi. Shelves and closet front already glued. I begin to place I begin to place the thermal insulation (polystyrene of 20mm and 25 kg/m3 density). It is also observed the entrance sector to the room with the bank and their respective closet and shelves are finished. | 12-Mar-2007: View from entrance room seat. Can be observed the progress of thermal insulation work. |
12-Mar-2007: Detail of thermal insulation on cabin roof and closet area. |
12-Mar-2007: Insulation already placed below floor and cockpit sides. | 12-Mar-2007: General view of work. |
13-Mar-2007: After to impregnate all the roof of cabin, we begins to place the insulation. Here view from forward bed. |
13-Mar-2007: Another view. | 13-Mar-2007: View towards prow. Can be observed the front of port side shelves over the forward bed. |
14-Mar-2007: Finishing placing the insulation under the deck that makes roof to the prow bed. |
14-Mar-2007: Thermal insulation ready. | 14-Mar-2007: Another view. Can be observed the fiberglass reinforcement made in section "0" contour. |
14-Mar-2007: View from forward bed. |
14-Mar-2007: My girls take advantage of finishing of aft room: the older for sleeping, the younger for playing!!. |
MARCH 2007 |
< PREVIOUS > | < NEXT > |