06-Oct-2006: Prow deck and anchor box finished. It is lack to cut the excess of the overboard. | 06-Oct-2006: Placing the strips of overboard to reaching the last section. |
09-Oct-2006: Testing the first plywood layer (6 mm) of lateral of the cabin. |
09-Oct-2006: Preparing the laminated wood to reinforce the union between front of cabin/roof/deck. | 09-Oct-2006: Second layer placed. |
11-Oct-2006: Front of cabin already laminated with three plywood layers (10 mm) and 2 layers of lateral already glued. |
11-Oct-2006: Frontal view. A while after making this picture, I would suffer a serious accident cutting the plywood excess of cabin lateral. If you are not impressionable click here. |
20-Oct-2006: After a week of inactivity I resume the construction with only one hand. Here already finished the cuttings of the cabin. |
21-Oct-2006: Detail of the front of cabin and of the longitudinal reinforcement that still has to "lower." |
21-Oct-2006: Lateral of the cabin profiled. It is lack to glue the longitudinal reinforcements that come from the roof in the front of the cabin. | 21-Oct-2006: Beginning to close the roof of the cabin with two layers of plywood (6 mm), cut of 30 cm of width and I placed at 45 degrees of center line and at 90 degrees one each other. |
22-Oct-2006: Placing the two last pieces of the first layer. |
22-Oct-2006: Completed the placement of the first layer and cutting all the surpluses. | 23-Oct-2006:Beggining the second layer at 90 degrees. |
23-Oct-2006: Another view where the plywood placement outline can be observed. As they are very soft, the second layer it is screwed at the first to force it to ascend or to lower. Then I take out the screws. |
23-Oct-2006: Sanding the front of cabin, resting to the epoxi!! | 23-Oct-2006: Still lack to round enough... |
23-Oct-2006: Detail of plywood waiting to be placed in the second layer. |
23-Oct-2006: Another view of the union of the front cabin/deck/lateral of cabin. | 23-Oct-2006: Starboard view... |
23-Oct-2006: Port view.... |
23-Oct-2006: Finished the placement of the second layer of plywood. Only is lacking sanding and putty where it is necessary. | 24-Oct-2006: Beginning to sand all the edges to generate the curves of the project. |
30-Oct-2006: The week that I was "kept" by the accident, take advantage to finish the last three frames that conform the cockpit. Here testing them together with the longitudinal reinforcements. |
31-Oct-2006: Frames placed y glued. The floor support for the cockpit too. | 31-Oct-2006: View from above of cabin (I can already walk for above!!) |
31-Oct-2006: Placing the bigger hatch to cut the roof and making the reinforcement structure of below. |