Layout Construction Progress February 2008 These photos show the progress since the previous photos
were taken two months ago. Much of the effort has been directed toward the details around the National Orange packing house as shown in the model and prototype photos.
The first layout photo (below) shows the front of the packing house from the west side of Pachappa Ave. ![]() ![]() Jim Lancaster Photo.
![]() Jim Lancaster Photo.
The next layout photo (below) shows the packing house from Pachappa Avenue. ![]() Note the manhole covers, the two tracks in the street, the drain in the street just to the left of the palm tree, the pipe in the pavement, and the yellow posts protecting the side doors and the cull loader. Now compare that view above with the photo below taken by Keith Jordan in 1987. ![]() Keith Jordan Photo.
![]() Jim Lancaster Photo.
![]() Jim Lancaster Photo. ![]() Jim Lancaster Photo.
The last layout photo (below) shows the National Orange packing house from further south along Pachappa Ave. ![]() Note the concrete street light and then compare the view above with the two photos below taken in 1987 and 1993 by Keith Jordan and Cliff Prather. ![]() Keith Jordan Photo. ![]()
Cliff Prather Photo.
![]() Jim Lancaster Photo.
![]() Jim Lancaster Photo.
Last update: 2/4/08 |