|
Rebuild navigation station and flush mount all electronics (DONE)
Purchase and install new stereo and Standard Horizon VHF (DONE)
Purchase and install Clock and Barometer at navigation station (DONE)
Purchase
and install kicker pad on stern pulpit (DONE)
Refinish all exterior teak with Cetol (DONE)
Refinish all large teak surfaces below with satin varnish (DONE)
Refinish all teak trim below with gloss varnish (DONE)
Refinish all teak in head with gloss varnish (DONE)
Power wash all lockers and repaint with original Petit EasyPoxy Bikini Blue (DONE)
Purchase and install 6 new brass bulkhead lamps in cabin (DONE)
Purchase and install 4 new brass dome lites in cabin (DONE)
Replace all halyards with 7/16 inch Sta-Set (DONE)
Install new sub circuit breaker panel at navigation station (DONE)
Purchase new mainsail cover (DONE)
Replace roller furling line with new 5/16 inch Regatta Braid
(DONE)
Refurbish steering pedestal
(DONE)
Replace keel nuts and washers
(DONE)
Purchase and install new stainless steel cowl vents on dorade boxes
(DONE)
Fabricate sunbrella bag for stowing inflatable on top of coachroof
(DONE)
Purchase cushions for cockpit (DONE)
Click HERE to view photos of a few of these projects