No. Activities Frequency Responsible Person Input Output
A1 Select Size, Frequency and Number of Subgroups At set up Engineers, QA Control Plan, PFMEA, Customer Requirements Control Method as defined in Control Plans
A2 Set up Control Charts and record Raw Data Ongoing Mass Production Operators / Supervisors Blank Form Control Chart Filled-up Control Charts
A3 Calculate the Average and Range of each subgroup Ongoing Mass Production Operators / Supervisors Blank Form Control Chart Filled-up Control Charts
A4 Select Scales for the Control Chart At set up Engineers, QA Blank Form Control Chart Filled-up Control Charts
A5 Plot the Average and Range on the Control Chart Ongoing Mass Production Operators / Supervisors Blank Form Control Chart Filled-up Control Charts
B1 Calculate the Average Range (R-bar) and Process Average (X-double bar) Ongoing Mass Production Operators / Supervisors Blank Form Control Chart Filled-up Control Charts
B2 Calculate the Control Limits (UCL, LCL of both X-bar and R Chart) Ongoing Mass Production Operators / Supervisors Blank Form Control Chart Filled-up Control Charts
B3 Draw Lines for the Average and Control limits on the Charts Ongoing Mass Production Operators / Supervisors Blank Form Control Chart Filled-up Control Charts
C1, C4 Analyze the Data plot on the Range Chart and X-bar Chart Ongoing Mass Production Operators / Supervisors / Engineers Filled-up Control Charts Abnormal pattern identified on Filled-up Control Charts
C2, C5 Find and Address Special Causes Once Out-of-Control Condition is found during ongoing Mass Production Operators / Supervisors / Engineers Filled-up Control Charts, Cause-Effect Diagrams All Potential Special Causes
C3, C6 Recalculate Control Limits Once Out-of-Control Condition is removed during ongoing Mass Production Operators / Supervisors / Engineers Filled-up Control Charts Filled-up Control Charts with revised Control Limits
C7 Extend Control Limit for Ongoing Control At Setting up and periodically as needed Engineers Filled-up Control Charts with revised Control Limits New Control Limit as Guideline
C8 Implant Concept on "Control" Ongoing Mass Production All Analyzed Control Charts Better understanding in Continuous Improvement
D1 Calculate the Process Standard Deviation Periodically Engineers Filled-up Control Charts Process Standard Deviation (Spread)
D2 Calculate the Process Capability Periodically Engineers Process Standard Deviation (Spread), Customer Specification Cpk
D3 Evaluate the Process Capability Periodically Engineers Calculated Cpk and Customer Requirements Needed Action
D4 Improve the process Capability Periodically Engineers Analyzed Control Charts, Calculated Cpk and Expected Cpk List of further actions
D5 Chart and Analyze the Revised Process Repeat the above steps All All Action Result, Revised Control Plan, Revised PFMEA