| SPC Implementation | |||||
| No. | Activities | Frequency | Responsible Person | Input | Output |
| A1 | Select Size, Frequency and Number of Subgroups | At set up | Engineers, QA | Control Plan, PFMEA, Customer Requirements | Control Method as defined in Control Plans |
| A2 | Set up Control Charts and record Raw Data | Ongoing Mass Production | Operators / Supervisors | Blank Form Control Chart | Filled-up Control Charts |
| A3 | Calculate the Average and Range of each subgroup | Ongoing Mass Production | Operators / Supervisors | Blank Form Control Chart | Filled-up Control Charts |
| A4 | Select Scales for the Control Chart | At set up | Engineers, QA | Blank Form Control Chart | Filled-up Control Charts |
| A5 | Plot the Average and Range on the Control Chart | Ongoing Mass Production | Operators / Supervisors | Blank Form Control Chart | Filled-up Control Charts |
| B1 | Calculate the Average Range (R-bar) and Process Average (X-double bar) | Ongoing Mass Production | Operators / Supervisors | Blank Form Control Chart | Filled-up Control Charts |
| B2 | Calculate the Control Limits (UCL, LCL of both X-bar and R Chart) | Ongoing Mass Production | Operators / Supervisors | Blank Form Control Chart | Filled-up Control Charts |
| B3 | Draw Lines for the Average and Control limits on the Charts | Ongoing Mass Production | Operators / Supervisors | Blank Form Control Chart | Filled-up Control Charts |
| C1, C4 | Analyze the Data plot on the Range Chart and X-bar Chart | Ongoing Mass Production | Operators / Supervisors / Engineers | Filled-up Control Charts | Abnormal pattern identified on Filled-up Control Charts |
| C2, C5 | Find and Address Special Causes | Once Out-of-Control Condition is found during ongoing Mass Production | Operators / Supervisors / Engineers | Filled-up Control Charts, Cause-Effect Diagrams | All Potential Special Causes |
| C3, C6 | Recalculate Control Limits | Once Out-of-Control Condition is removed during ongoing Mass Production | Operators / Supervisors / Engineers | Filled-up Control Charts | Filled-up Control Charts with revised Control Limits |
| C7 | Extend Control Limit for Ongoing Control | At Setting up and periodically as needed | Engineers | Filled-up Control Charts with revised Control Limits | New Control Limit as Guideline |
| C8 | Implant Concept on "Control" | Ongoing Mass Production | All | Analyzed Control Charts | Better understanding in Continuous Improvement |
| D1 | Calculate the Process Standard Deviation | Periodically | Engineers | Filled-up Control Charts | Process Standard Deviation (Spread) |
| D2 | Calculate the Process Capability | Periodically | Engineers | Process Standard Deviation (Spread), Customer Specification | Cpk |
| D3 | Evaluate the Process Capability | Periodically | Engineers | Calculated Cpk and Customer Requirements | Needed Action |
| D4 | Improve the process Capability | Periodically | Engineers | Analyzed Control Charts, Calculated Cpk and Expected Cpk | List of further actions |
| D5 | Chart and Analyze the Revised Process | Repeat the above steps | All | All | Action Result, Revised Control Plan, Revised PFMEA |