Table 1 - TIER 1 SUPPLIER Tagging system |
4.13 |
|||||||
4.8 |
4.12 |
Segregation |
Disposition |
disposition made within |
||||
Attached with materials |
Vendor’s tag / vendor |
inspection status by vendor |
- |
- |
||||
Receiving Inspection |
Vendor ’s tag |
O.K. (Green) / NG (Red) Sticker by QC |
NG Sticker with tick + designated areas by QC |
As defined in NG sticker by QC |
1 day |
|||
Storaging |
Vendor ’s tag |
O.K. Sticker by QC |
NG Sticker with tick + designated areas by QC |
As defined in NG sticker by QC / Storeman |
Each lot or at most 1 day |
|||
Part Production + In-Process Inspection |
Vendor ’s tag |
All O.K. parts will be in line. All NG parts will be tagged (red) and put in red boxes. |
All NG parts will be tagged (red) and put in red boxes by Production and QC |
Rework, Scrap, Salvage by Production or QC |
1 shift |
|||
W.I.P. |
Part Tag for O.K. parts Red Tag for NG parts |
Part Tag for O.K. parts Red Tag/red box for NG parts |
All NG parts will be tagged (red) and put in red boxes by Production and QC |
Rework, Scrap, Salvage by Production or QC |
1 shift |
|||
Assembly Production + In-Process Inspection |
Part Tag for O.K. parts Red Tag for NG parts |
All O.K. parts will be in line. All NG parts will be tagged (red) and put in red boxes. |
All NG parts will be tagged (red) and put in red boxes by Production and QC |
Rework, Scrap, Salvage by Production or QC |
1 shift |
|||
Finished Goods |
Finished goods tags for O.K. Parts Red Tag for NG parts |
All O.K. parts will be in line. All NG parts will be tagged (red). |
All NG parts will be tagged (red) and put in designated areas by Production and QC |
EAPA, Rework, Scrap, … |
1 day |
|||
Returned goods (Suspect/ NG) |
Delivery Tag (:lot No., delivery date) |
Customer 's inspection result |
Tag + location |
Per discussion |
??? |