EXPERIENCE
|
|
Romania (October 2005 - to date) March 2008 - to date SGS Romania SA
March 2008 - to date Business Manager - Industrial Services
Managing resources using budgets for achieving business targets, developing strategies and supporting growth;
Reporting to Managing Director
|
| |
October 2005 - March 2008 Washington E & C Romania (Washington Division of URS Corporation)
July 2006 - March 2008 Sourcing Manager
Identification and pre-qualification of European vendors;
Vendor Performance Evaluation on project
Vendor performance improvements coordination
Reporting to Corporate Global Sourcing Manager and Corporate Procurement Director
October 2005 - March 2008 Project Expediting Coordinator
Oil and Gas Equipment's - P.O. Follow up;
Tracking and scheduling Fabrication and Testing, Monitor shipments up to receiving on site
Assist suppliers on solving non conformities
Reporting to Project Procurement Manager and Procurement Director
|
| |
Poland (July 2004 - October 2005) July 2004 - September 2005 Tecnimont
(Tecnimont Poland, PP-HDPE Plant - Monika Project Site, Plock)
Welding Engineer
Document Control Supervision for Local Authority (UDT) approval of subcontractor's manufacturing data books;
QA/QC for mechanical completion
Welding supervision of piping field and prefabrication activities
Reporting to Site QA Engineer
|
| |
Romania (1999 - July 2004)
January 2004 - July 2004 Snamprogetti
Romania s.r.l. Bucharest
Quality Coordinator
Quality Management System definition according ISO 9001:2000;
Quality Assurance for engineering activities Reporting to General Manager
|
| |
1996 - December 2003 Washington
Group Romania s.r.l. Ploiesti
Formerly Raytheon
Engineers & Constructors till September 2000
Senior Inspector Gr.
2
Romania (1999 - December 2003)
Reactors inspection on behalf of ExxonMobil Engineering Europe Ltd. and Foster Wheeler Italiana for Esso Italiana Projects, the expanding and upgrading of the Refinery and Desulfurization Plants at Augusta and Trecate, Italy. Carbon steel and low alloy with stainless steel clading, pressure vessels fabrication in GRIRO Bucharest, according ASME VIII and PED 97/23/CE
Towers and drums inspection on behalf of ExxonMobil Engineering Europe Ltd. and Foster Wheeler France for Port Jerome 21 Project, the expanding and upgrading of the Refinery and Desulfurization Plant at Gravenchon France. Carbon steel and high alloy clading, heavy wall pressure vessels fabrication in GRIRO Bucharest, according ASME VIII and PED 97/23/CE
Subcontracting and estimating for Rosia Montana Gold Project proposals.
Volume Bottles Partial Inspection in manufacturer's workshop (UZUC s.a. Ploiesti) for EMR&E (ExxonMobil Research & Engineering) Billings Refinery, Montana, USA.
Vessels ordered with ASME "U" stamp from Kellog Brown & Root - Engineering and Construction Group of Halliburton and ExxonMobil through
Nuovo Pignone. Inspection Assignment from EMR&E London and Eurtrue s.r.l. Italy.
Washington Group Romania web site design on Washington Group International Inc. Intranet network.
Piping Flange, Wrought Fitting
and Perry
Filter Inspection in Vilmar-Groupe
Genoyer Ramnicu Valcea and UZUC
Ploiesti for West Delta Deep Water, Scarab/Safron
Development gas offshore project. Assigned by Quality
Instrument Services B.V., the inspection has been performed on behalf
of Bechtel-Intec-Enppi
Consortium according ASME B 16.5, B16.9 and VIII Div.1 "U" stamp.
Project Procurement for Rompetrol
Rafinare
Petromidia - FCC Unit several spare parts; indirect procurement for office
supplies.
Supplier Database design and
administration; supplier evaluation and qualification
Inspection, Expediting, Traffic
and Custom Clearance for carbon steel, high and low pressure, steam drums
fabrication on GRIRO s.a.., Bucharest
workshops. Heat Recovery Steam Generator's steam drums have been manufactured
according ASME Code "S" and "U" stamp,
for NEM B.V. and Vogt-NEM
Inc. Final destinations for steam drums were: NEPCO Scotland, Griffith
USA, Desert Basin USA, Payne Creek USA, Abquaiq Saudi Arabia, Castellon
Spain. More than 1100 metric tones of equipment some with 180 mm wall thickness
and 200 t / pcs. Reporting to WGR Project Manager.
Macedonia (2000)
Technical survey of existing
water treatment facilities in Ohrid - Macedonia for a rehabilitation project
under IWACO and USF Rossmark Waterbehandeling
B.V. co-ordination. Piping, tanks, static and dynamic equipment condition
evaluation. Reporting to Client Project Manager.
Slovak and Czech Republic
(1997- 1999)
Inspection and Expediting for
carbon and stainless steel low pressure vessels fabrication on Slovnaft-Metalchem
a.s., Bratislava - Slovak Republic and Skoda
a.s. Plzen-Czech Republic, for EFPA Project - Slovnaft
Refinery Residue Upgrade, Bratislava Slovak Republic. More than 50 equipments
and 270 t delivered to site for FCC, MTBE, Merox and Alkylation Units.
Reporting to Raytheon The Hague, Manager of Inspection for Europe.
Piping Supervision for workshop
piping prefabrication and for piping erection on site, Slovnaft
Refinery Residue Upgrade, Bratislava Slovak Republic. Carbon, Low Alloy
and Stainless Steel pipes connections, pre commissioning punch list preparation
and hand over, together with UOP / IFP licenser. Reporting to Raytheon
The Hague Construction Superintendent
Romania (1996-1997)
Inspection / Expediting and
Construction Superintendent for Dero Lever / Unilever
Detergent Plant including site and supplier shop activities. Civil, Commissioning
and Safety Jobs performed. Subcontractors coordinated were: NIMB S.A. Buzau,
BETA
S.A. Buzau, TMUCB Ploiesti,
PETROMONT
S.R.L. Ploiesti, STIZO
S.A. Ploiesti, TIAB
S.A. Ploiesti, INSPET
S.A. Ploiesti Reporting. ISCIR codes applied. Reporting to Construction
Manager
Inspection, Expediting and Quality
Control on Vendor Shop for fired heater fabrication for: Surinam Refinery;
Ras Tanura - KTI / BECHTEL Refinery;
Air
Liquid - Rozemburg Refinery. Vendors involved were: 24
Ianuarie S.A. Ploiesti - part of Uzinsider Group, UZUC
S.A. Ploiesti. API 560, API RP 530, ASME and Stoomwezen codes applied.
Reporting to Raytheon Romania Procurement Manager
|
|
|
1996 - 1996
Universal Montaj Darzeu S.R.L. Ploiesti
Quality Assurance
Engineer
Quality Assurance Consulting
for manufacturing, installing, maintaining operation for Refinery Equipment
(i.e. : PETROMIDIA
s.a. and PETROBRAZI
s.a..) like atmospheric tanks, steam drums, fired heaters, heat exchangers,
columns and piping connections
Manufacturing Data Books, Quality
Inspection Plans and Quality Assurance Manual / System Procedures Preparation
according to ISO 9001 and API / ASME Standards.
Reporting to the company owner.
|
|
|
1995 - 1996
Armis S.R.L. Ploiesti
Sales/ Media Engineer
Desktop Publishing, Drafting
and Designing using CAD/DTP dedicated software.
The company products (stamping
and advertising industry) leaflets and operating manuals preparation. Reporting
to the company owner.
|
|
|
1992 - 1995
UPETROM S.A. Ploiesti
Quality Control Manager
for Steel Foundry (1994 to 1995)
Quality Control team coordination
(30 control operators) for casting of valves API 6A, 6D, 600, 595; parts
for down hole oil well pumps; spherical pulsation dampers; blowout preventors
API 16A; drilling and production hoisting API 8A; rotary drilling equipments
API Sp. 7; and other parts for 150 up to 2000 bar . Reporting to Quality
Assurance Manager
Quality Assurance
Engineer (1992 to 1994)
Destructive and Non Destructive
Laboratory Tests for Material Properties Identification. Reporting to Chief
of Laboratory.
Manufacturing Data Books, Quality
Inspection Plans and Quality Assurance Manual/System - Procedures Preparation
for Crude Oil Drilling Equipment Manufacturer according to ISO 9001 and
API Standards. Reporting to Quality Assurance Manager.
|
EDUCATION |
|
1987 - 1992 Politechnical
Institute of Bucharest, Material Science Faculty
Engineer Diploma
Majored in Melting and Casting
of Special Property Metallic Alloys from Material Science and Technology
Department of Bucharest Polytechnic Institute.
Five year averaged GPA was 8.58
(of max. 10).
Diploma exam passed with 10.
|
|
|
1982 - 1986
"Mihai Viteazul" High School Ploiesti
High School Diploma
Majored in electrotechnical
field.
Four year averaged GPA was 8.23
Bachelor exam passed with 8.62
|
SKILLS |
|
Languages:
English
French
Italian
Softwares:
Intergraph eMarian - Material Management Software
Microsoft Office
Primavera Sure Trek
Professional Training
2008 Occupational Health and Safety Specialist Diploma from Protem SSM and Ministry of Labor, Family and Equality of Chances - Protem SSM
2007 DOD / DOE Contract and Subcontracts Negotiation Seminar, Moscow Material Management Organization, Washington Group International Inc. USA - URS Washington Division
2007 Contracting Training for Coalition Partners Seminar in Bucharest Defense Acquisition University and American Chamber of Commerce - Contracting Training
2007 Global Strategy & Sourcing Conference, in Boise and Princeton Material Management Organization, Washington Group International Inc. USA - URS Washington Division
2007 "Extraordinary Leadership and Masterful Coaching" 2 days seminar in Bucharest at Washington E&C Romania by Robert Hargrove, the author of "Masterful Coaching" book - Robert Hargrove
2007 "Bullet Proof Manager training by Crestcom, in Bucharest at Washington E&C Romania - Crestcom
2004 Quality Management Systems - ISO 9001:2000, External Auditor (ISO 19011:2002) TAR ZERT Diploma from TUV Akademia - TUV Rheinland Berlin Brandenburg Bucharest
2004 Quality Management Representative - ISO 9001:2000, Diploma from TUV Akademia
2004 Quality Management Specialist - ISO 9001:2000, Diploma from TUV Akademia
2001 International Commerce
Referee Diploma from Romania Work Ministry and Prahova
Chamber of Commerce
2001 Authorization issued by
I.S.C.I.R.
for Non Destructive Examination by means of Dye Penetrate, Magnetic Powders,
Ultrasonic and Radiographic Examination (Level 2) - 2 years validity.
1997 Authorization for control
of design and fabrication for pressure vessel, issued by I.S.C.I.R.
(Romanian National Board for Construction and Inspection of Pressure Vessels)
No. 33/30.07.98 - validity 2 years.
1996 ASME
Sect. I & VIII, Training Seminar with ASME and British Engine Consultants,
Bucharest
Auto Plant in-house training
during May 1996 at Universal Montaj Darzeu company
1986 Clean Driving License
|