BHUSAWAL DIVISION - MILESTONES
.1853 - Survey completed beyond Igatpuri towards Khandesh-Berar.
1866 - Bhusawal-Khandwa opened.
1867 - Bhusawal-Badnera opened as single line.
1911 - Bhusawal Station second platform constructed.
(The existing DN platform).
1914 - Murtizapur-Achalpur/Yavatmal narrow gauge opened.
1919 - Bhusawal Steam Loco Shed setup.
1920 - Bhusawal Division formed under G.I.P. Railway.
1922 - Bhusawal-Badnera Doubling of track completed.
1923 - Bhusawal Marshaling Yard opened.
1927 - Khandwa Station building electrified.
1931 - Bhusawal Station building electrified.
1957 - Bhusawal Yard remodeling started.
1962 - Bhusawal - Central Railway Zonal Training School setup.
1963 - Bhusawal Yard 1st remodeling completed.
1968 - Bhusawal-Igatpuri - Signalling switched over from TALQ (Two Aspect Lower Quadrant) to MACLS (Multi Aspect Colour Light Signalling) (JULY).
- Bhusawal Electric Loco Shed setup.
1969 - Igatpuri-Bhusawal section Electrified with 25 KV AC Traction.
1972 - Bhusawal Electric Loco Shed started functioning.
1981- Bhusawal - Chord Line constructed.
1990 - Bhusawal-Badnera section Electrified with 25 KV AC Traction.
- Signalling switched over from TALQ to MACLS.
1992 - Bhusawal-Khandwa section Electrified with 25 KV AC Traction.
- Signalling switched over from TALQ to MACLS.
1993 - Bhusawal-Bhadli Automatic Block Signalling commissioned.
- Bhusawal-Steam Loco shed closed.
- Last Steam Loco withdrawn on 16th DEC.
1995 - Bhusawal- Route Relay Interlocking commissioned (JAN).
1996 - Bhadli-Jalgaon Automatic Block Signalling commissioned (JAN).
1997 - MMR Yard Remodeling.
- Panel Commissioned (MAR).
1998 - JL Panel Commissioned (APR).
1998 - Panewadi oil siding (BPCL) Commissioned.
2000 - KNW Yard Remodeling.
- Panel Commissioned (MAR).
1. Bhusawal division has a route kilometer of 727 & 244 Kms on B.G. and N.G. respectively and is at the heart of Railway operations of Central Railway due to its location. The division is also connected with Western Railway at Jalgaon & Khandwa and with South Central Railway at Akola, Khandwa and Manmad. Bhusawal Division deals mostly with through traffic and has to function as a buffer Division as it is required to regulate the traffic as per the needs of adjoining Divisions in the event of any operating problems. Bhusawal Division has to undertake the job of speedy movement of Box, Jumbo and Oil tank rakes for timely feeding to Collieries, Goods sheds and refineries.
2. The division falls in the jurisdiction of two states namely, Maharashtra and Madhya Pradesh. Following Civil districts are served by the division: - Nasik, Malegaon (Manmad), Dhule, Khandwa (M.P), Buldhana (Malkapur), Akola, Amravati and Yeotmal. The Divisional Commissioners located in the division are at Nasik and Amravati.
3. Three Major power houses at Nasik, Bhusawal and Paras are situated within the Division. Consistent flow of coal rakes has to be maintained for the power houses. Coal traffic for some power houses in Gujarat also passes through Bhusawal Division.
4. The Division deals with outward traffic of Onions, Sugar, Food grains of FCI, Oil cakes, Full pressed cotton, Grains, Pulses & PVC pipes. The revenue earning traffic of raw Plantains and Coaching rated Grape traffic and the Military / Ordnance traffic from Lahavit, Devlali, Nasik, Kasbesukene, Varangaon and Bhusawal is also handled. The important stations on the Division are Devlali, Nasik, Manmad, Dhule, Jalgaon, Akola, Khamgaon, Amravati and Khandwa.
5. The Division is divided into three main sections viz. Bhusawal - Igatpuri, Bhusawal - Khandwa and Bhusawal - Badnera sections. All the trains are worked with AC/Diesel traction.
5.1
SECTION - WISE KILOMETERS:MAIN LINES (ELECTRIFIED DOUBLE LINE)
A) BHUSAWAL - IGATPURI (BG) 307.61 }
}
B) BHUSAWAL - BADNERA (BG) 218.53 } TOTAL : 649.61
}
C) BHUSAWAL - KHANDWA (BG) 123.47
}
BRANCH LINES (SINGLE LINE)
D) CHALISGAON - DHULE ( BG ) 56.39 }
E) JALAMB - KHAMGAON ( BG ) 12.34
} TOTAL : 77.81F) BADNERA - AMRAVATI ( BG ) 9.08 }
NARROW GAUGE (SINGLE LINE)
G) PACHORA - JAMNER (NG) 55.62 }
H) MURTAJAPUR - YAVATMAL (NG) 112.27 } TOTAL : 244.45
I) MURTAJAPUR - ACHALPUR (NG) 76.56 }
5.2 NUMBER OF STATIONS:
BLOCK STATIONS .. 84
NON - BLOCK STATIONS .. 38
------
TOTAL 122
6. STAFF STRENGTH OF THE DIVISION.
The Sanctioned Strength of the Division as on 30.11.2001 :-
Group 'A' ... 70
Group 'B' ... 29
Group 'C' ... 12162
Group 'D' ... 11624
-----------
Total 23885
7. A centralized Traction Motor Repair workshop catering to the needs of all Indian Railways is located at Nasik. This workshop undertakes repairs to traction motors for the Electric locos.
8. The Indian Railway Institute of Electrical Engineering (IRIEEN) is also situated at Nasik. This Institute has come up in recent years and besides undertaking responsibility for training of probationers of Indian Railway Service of Electrical Engineers, the Institute also conducts specialised courses in different aspects of Electrical Engineering pertaining to the Railways.
9. An Electric Loco POH (Periodical Overhaul) Workshop is situated at Bhusawal. At present the capacity of the workshop is 12 overhauls per month. Electric Locomotives from all railways undergo POH at Bhusawal. The staff strength of the workshop is 1709. The workshop is administered directly by Chief Electrical Engineer, C. Rly.
10. A Zonal Training Centre is located at Bhusawal. This is the Centralised training facility for the entire Railway. Training for Assistants, Shunters, Drivers, Station Masters, Commercial Staff, Electrical Fitters, Refrigeration Mechanics & Engineering staff is imparted in this school. Approximately 1000 trainees undergo training in different disciplines at any time in this school. A well-equipped model room is available for training of Station Masters on all types of instruments and on all system of working available on the Central Railway.
A Drivers' Training Simulator
has also been installed for live training of the Drivers under AUSAID project.10.1 A Centralised Engineering Workshop is situated at Manmad under the direct control of Chief Engineer, Central Railway, Bombay. This workshop undertakes fabrication of steel structural items including Bridge Girders (longest span built so far is 400 ft. or 122 m. KRCL). Approximately 1160 employees work in the Engineering Workshop.
11. INFRASTRUCTURE MAINTENANCE FACILITIES IN THE DIVISION.
1. Electric Loco Shed at Bhusawal.
2. Freight Shed & ROH at Bhusawal.
3. Coaching maintenance depot at Manmad.
4. Diesel Engine Trip Shed at Bhusawal.
5. AC Loco Trip Shed at Bhusawal, Manmad & Igatpuri.
6. Coaching Maintenance Depot at Bhusawal.
7. NG Diesel Loco Shed at Murtizapur.
8. TXR depot at Murtizapur.
9. TXR depot at Bhusawal.
12. IMPORTANT GOODS SHEDS
1. NASIK
2. LASALGAON
3. NIPHAD
4. MANMAD.
5. NANDGAON.
6. DHULE.
7. CHALISGAON.
8. PACHORA
9. JALGAON.
10. AKOLA.
11. KHAMGAON
12 AMARAVATI.
13. BURHANPUR.
14. KHANDWA.
15. SAVDA.
16 NIMBHORA
17. RAVER
13.
MAJOR LOADING POINTS.
POL : PANEWADI
ONION : NASIK, NIPHAD, LASALGAON,
: MANMAD, NANDGAON
GRAPE : DEVLALI TO MANMAD.
RAW PLANTAIN
: KAJGAON, BHUSAWAL, SAVDA,: NIMBHORA, RAVER, WAGHODA,
: BURHANPUR
DEOILED CAKE (DOC) : KHANDWA, BADNERA.
GRAINS, PULSES & HUSK : AKOLA, BADNERA, KHAMGAON &
BHUSAWAL.
14.
PLACES OF INDUSTRIAL AND COMMERCIAL IMPORTANCEDEVLALI Centre & School of Artillery.
NASIK The Thermal Power Station/Eklehara.
The Security Press.
The Hindustan Aeronautics Ltd.
Sugar Factories.
Blow Plast (VIP) factory.
Mahindra & Mahindra Ltd.
Bytco Industries.
Other Small Scale Industries.
KASBESUKENE Sugar Factory.
NIPHAD
Karmavir Sugar Factory.MANMAD Food Corporation of India.
Indian Oil Corporation }
Bharat Petroleum } Oil Depots.
Hindustan Petroleum Corporation }
Sugar Factory at Dabhadi.
NANDGAON BEMCO Sleeper Factory.
CHALISGAON
Textile MillsSugar Factory at Belganga.
Sugar Factory at Bhoras (Kannad)
DHULE Sugar Factory, Navalnagar.
Textile Mill.
PACHORA Mansingka Industries.
Lingesh Durga (Cattle Food)
JALGAON Jain Pipes.
Supreme Pipes.
Blow Plast Ltd..
Raymond Woolen Mills.
Panchsheel Paper Mills.
Shama Fire Works.
Jilha Dudh Federation
Other Small Scale Industries.
BHUSAWAL Thermal Power Station Deepnagar.
Ordanance Factory.
Reserve Petroleum Depot.
VARANGAON Ordnance Factory.
PARAS
Thermal Power Station.
AKOLA
Polyolefin Industry. (PIL) Co.
DUSKHEDA Vindhya Paper Mill.
SAVDA
Sugar Factory at Faizpur.
BURHANPUR
Sugar Factory.Tapti Mills.
NEPANAGAR Nepa Paper Mills.
KHANDWA BEMCO Sleeper Factory.
Food Corporation of India (Godowns)
Mansingka Oil Industries.
15.
PLACES OF RELIGIOUS AND TOURIST IMPORTANCENASIK This city is located on the banks of the river Godavari. Kumbh Mela locally known as Sinhastha Fair is held after every 12 years. The next Sinhastha Mela shall be held in 2003. Trimbakashwer temple is located 35 kms away from Nasik Road Station.
MANMAD
Shirdi is at 58 Kms. distance from Manmad. Shri. Sai Baba Temple is situated there.CHALISGAON The world famous Ellora Caves are 63 Kms. from Chalisgaon.
Kalimath (Kannad) temple is 35 kms from Chalisgaon.
JALGAON
Ajanta Caves are 55 Kms from Jalgaon.
SHEGAON
Shri Gajanan Maharaj Temple is situated here.
BURHANPUR A Pilgrim Place for Bohara Community.
KHANDWA Omkareshwar Temple is situated 85 Kms from Khandwa
ACHALPUR
Chikhaldara (Hill station) & Melghat tiger project are 35-40 Km. away.ACCOUNTS
1. ORGANISATION
Sr. DAO 1 HIRA BALLABH
DAO 1 K. S. DEOKATE
ADAO 3 N.D.SHINDIKAR, D. KHAIRA & A.K.RAGHUVANSI
Class III 133
Class IV 14
1.1 WORKING EXPENSES (Demand 03 To 13)
The Spending Limit for 2001-02 under Demand No. 03 to 13 is Rs. 448.90 crores, which is 2.85 % more than the actual expenditure incurred by the Division during 2000-2001. As against the budget proportion of Rs.266.20 crores to end of October 2001, the actual expenditure incurred by the Division is Rs. 259.44 crores, which is Rs. 6.77 crores (2.54 %) less than the budget proportion.
(Fig. in thousand of Rs.)
|
D.No |
Spending limit 2000-01 |
Budget prop. |
Actual Exp. to end Oct' 2001 |
Actual Exp. to end Oct' 2000 |
Variation over B.P.
(4 - 3) |
Variat-ion in %age over B.P. |
Increase-se / Decrease over L.Y. (4 - 5) |
Increase / Decrease in %age over L.Y. |
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
|
03-A |
123399 |
74014 |
73414 |
74921 |
-600 |
-0.81 |
-1507 |
-2.01 |
|
04-B |
534975 |
324348 |
357442 |
324750 |
33094 |
10.20 |
32692 |
10.07 |
|
05-C |
268659 |
158584 |
177770 |
152781 |
19186 |
12.10 |
24989 |
16.36 |
|
06-D |
156239 |
93406 |
103722 |
83492 |
10316 |
11.04 |
20230 |
24.23 |
|
07-E |
259952 |
156407 |
181558 |
174200 |
25151 |
16.08 |
7358 |
4.22 |
|
08-F |
520755 |
309640 |
275924 |
286511 |
-33716 |
-10.89 |
-10587 |
-3.70 |
|
09-G |
511724 |
308653 |
323273 |
321214 |
14620 |
4.74 |
2059 |
0.64 |
|
10-H |
1777239 |
1036779 |
901549 |
943522 |
-135230 |
-13.04 |
-41973 |
-4.45 |
|
11-J |
172843 |
103566 |
109313 |
109173 |
5747 |
5.55 |
140 |
0.13 |
|
12-K |
161659 |
95699 |
88943 |
88076 |
-6756 |
-7.06 |
867 |
0.98 |
|
13-L |
1600 |
933 |
1454 |
835 |
521 |
55.84 |
619 |
74.13 |
|
Total |
-2.54 |
1.36 |
1.2 WORKS EXPENDITURE
The allotment for 2001-02 under Demand No. 16 for all the plan heads is Rs.46.04 crores. As against this, the actual expenditure to end of October 2001 is Rs.25.82 crores, which is 56.08 % of the allotment.
1.3 PERFORMANCE EFFICIENCY INDEX (PEI)

APRIL - OCTOBER
|
Year |
Working Expenses ( In Crores) |
Originating Earnings ( In Crores ) |
PEI (%) |
|
1998-1999 |
229.62 |
86.88 |
264.29 % |
|
1999-2000 |
249.65 |
203.36 |
122.76 % |
|
2000-2001 |
255.95 |
246.47 |
103.85 % |
|
2001-2002 |
259.44 |
235.29 |
110.26 % |
Increase of PEI is due to fall of POL traffic.
1.4 Broad Profile of Working Expenses ( Demand 03 to 13 ) on Bhusawal Division:
The following table indicates percentage of total expenditure incurred on certain major heads. There is relative reduction of expenditure on staff cost and traction bills which is a happy development.
(Amount in Crores)
|
1998-99 |
1999-2000 |
2000-2001 |
|
|
Staff cost |
191.26 (48%) |
200.81 (47.15%) |
203.79 (46.69%) |
|
Elect. Traction bills |
148.79 (37.3%) |
160.71 (37.74%) |
156.92 (35.95%) |
|
Contractual Payment (Include non traction Elect. bills). |
22.96 (5.76%) |
25.07 (5.89%) |
28.84 (06.60%) |
|
Stock Items |
17.89 (4.49%) |
18.99 (4.46%) |
20.90 (04.79%) |
|
Non Stock Items |
6.37 (1.6%) |
8.36 (1.96%) |
8.40 (01.19%) |
|
Other * |
11.26(2.8%) |
11.93 (2.80%) |
17.60 (04.03%) |
|
TOTAL |
398.53 |
425.87 |
436.45 |
* Others include P U 18 -24 , P U 33 and 99 ( Office expenses, P&T, advertisement, water, electricity, office rental, stationary, transfer debit and miscellaneous )
** Percentage figures in bracket denote % over the total expenditure
1.5 Expenditure on OT, NDA and TA
There has been reduction of expenditure under the following controllable heads of expenditure. Statement showing the position to end of September is as under -
(To end of September )
( Figures in 000's of Rs. )
|
Year |
O.T. |
N.D.A. |
T.A. |
|
1998-1999 |
8747 |
12645 |
37399 |
|
1999-2000 |
9069 |
18310 |
29050 |
|
2000-2001 |
6992 |
16468 |
27962 |
|
2001-2002 |
4781 |
16423 |
27023 |
1.6 BILLS RECOVERABLE :
The amount outstanding against various outside parties as on 30.11.2001 is Rs.3.51 crores ( Approx. ). The servicewise break-up of the outstanding amount is as under -
1. Interest and Maintenance Charges of sidings - Rs.192.50 lakh
2. Staff Charges .. .. .. .. - Rs. 90.53 lakh
3. Plot Rent .. .. .. .. .. - Rs. 14.17 lakh
4. Electricity charges .. .. .. .. - Rs. 10.07 lakh
5. Actual Maintenance Charges of Level Crossings - Rs. 19.34 lakh
6. Water Charges .. .. .. - Rs. 7.39 lakh
7. Actual Maintenance Charges of sidings .. - Rs. 8.07 lakh
8. Building Rent .. .. .. .. - Rs. 6.19 lakh
9. Maint. charges of ROBs/RUBs /FOBs etc .. - Rs. 2.63 lakh
All efforts are being made for early realisation of outstanding dues by issuing reminders and personal visits at various levels. The major amount is outstanding against FCI (Rs.73.63 lakh), IOC/HPC Gaigaon (Rs.51.72 lakh) & IOC Shirud (Rs.43.65 lakh). Division has approached CCM regarding adjustment of the IOC's outstandings against "Own Your Wagon Scheme" payments as the party has shown reluctance for clearance.
1.7 AUDIT REFERENCES (PART-I)
There is no Audit para, Draft para and Provisional para pending against the division. At present, 02 Part-I Audit Notes and 01 Special Letter are awaiting finalisation. Efforts are on to clear these references at the earliest.
1.8 PROVIDENT FUND
Annual Reconciliation for 2000-01 has been completed and the updation of PF Pass-Books is in progress.
1.9 SETTLEMENT
All voluntary retirement cases are being cleared within 45 days of retirement and payment in superannuation cases is arranged on the last working day invariably.
1.10 PAYMENT OF STAFF AND OUTSIDERS
Payment of regular wages and other claims of the staff is arranged timely by the Accounts Office. Payment in normal superannuation cases is also arranged on the last working day invariably.
Payment of PLB for 2000-01 amounting to Rs.10.15 crores was smoothly arranged before Dashera to all the eligible staff of the division.
Banking Payment and Computerization of Pay Roll.
|
No of staff |
Coverage |
Percentage |
||||||||||
|
A |
B |
C |
D |
A |
B |
C |
D |
A |
B |
C |
D |
|
|
Computerisation of Pay Roll |
72 |
30 |
10955 |
11241 |
72 |
30 |
10955 |
8108 |
100 |
100 |
100 |
72.12 |
|
Banking Payment |
72 |
30 |
10955 |
11241 |
72 |
30 |
4855 |
2577 |
100 |
100 |
44.31 |
22.92 |
1.11 All the sections in the Accounts Office are passing their claims ( bills/pay sheets) on Computer. A Local Area Network consisting of 8 Nodes is presently installed in the Accounts Office.
1.12 SAVINGS DUE TO INTERNAL CHECK IN ACCOUNTS OFFICE.
Total savings due to internal check of staff / outsiders' claims and scrutiny of proposals, estimates etc. in the Accounts office were to the tune of Rs.2,86,69,627/- from April to October 2001.
1.13 INSPECTION OF EXECUTIVE OFFICES.
As per the Accounts Inspection Programme, approved by FA&CAO, total 55 units were inspected by Accounts Inspection Team during the period April 2001 to November 2001 as against the annual target of 87 units. Highlights of the Financial Gain / Recoveries pointed out are given below:
|
Sr. No. |
Nature of Item |
No. of Units ( Executive Offices) where the item mentioned in Col. 2 was noticed |
Amount (Rs.) |
|
1 |
2 |
3 |
4 |
|
1 |
Recovery of Over Drawn Wages / NHA |
16 |
1,73,572 |
|
2 |
Recovery of Electricity Charges |
17 |
2,03,192 |
|
3 |
Recovery of Damage Rent |
142 |
2,36,152 |
|
4 |
Recovery of House Rent |
3 |
534 |
|
5 |
Recovery of Festival Advance Recovery |
19 |
59,650 |
|
6 |
Recovery of GIS |
2 |
2,102 |
|
7 |
Recovery of conveyance charges |
3 |
19,468 |
|
8 |
Recovery due to irregularity in issue of passes |
1 |
7,084 |
|
9 |
Tea stall - outstanding water charges |
2 |
8,882 |
|
10 |
Recovery of License Fee |
4 |
2,17,266 |
|
11 |
Fine |
3 |
3,750 |
|
12 |
Admitted Debit |
1 |
303 |
|
13 |
Diet Charges |
1 |
189 |
|
14 |
Recovery of interest on advances |
1 |
36,256 |
************