02-08-00
Day shift
FAIRBANKS GOLD MINING, INC.
CONTROL ROOM REPORT
Time: 08:00:01 10:00:00 12:00:01 14:00:00 16:00:00 18:00:00
SAG MILL
New feed: 1815 1668 1654 1788 1331 2112
Recycle: 431 261 244 224 154 215
Sag speed: 102 102 102 102 102 102
SAG HP: 11843 12211 12349 11520 12519 11525
SAG psi: 760 738 738 732 735 730
SAG Noise: 4 62 82 96 97 118
BALL MILL - N/S
BM HP: 6881/6800 7062/6899 7157/6921 6916/6680 7105/6933 7343/7231
Cyclone GPM: 15652 13669 13178 13253 13940 12430
Cyclone psi: 17/17 16/15 15/15 20/18 16/16 12/12
Cyclone %sol: 54/58 53/58 52/57 54/59 50/55 43/50
PSM %-100: 0/-0 0/-0 0/-0 0/-0 0/-0 0/-0
PSM density: -0/-0 -0/-0 -0/-0 -0/-0 -0/-0 -0/-0
THICKENER
Rake torque: 45 43 33 41 34 21
Rake level: -0 -0 -0 -0 -0 -0
Slime level: 10.4 10.0 10.2 10.0 11.0 11.4
Floc gpm: 46.1 33.8 32.7 38.0 34.3 34.0
U/F %solids: 52.8 54.9 54.5 52.7 55.3 56.1
Underflow gpm: 10058 8423 8280 8820 8282 4392
U/F massflow: 1954 1733 1687 1713 1724 935
UTILITIES
Fresh water: 96 93 93 93 93 93
Process water: 89 90 97 97 92 91
Potable water: 68 65 64 61 59 58
Leach air psi: 32 32 32 32 32 31
Barge pumps: 4 2 3 2 2 3
RECYCLE CRUSHER
Crusher amps: 20 42 44 36 28 33
Feed oil temp: 103 94 104 102 104 104
Rtrn oil temp: 105 100 106 104 104 105
Dust seal gpm: 9.6 9.7 10.1 9.6 9.5 8.7
Diverter: 0 100 100 100 100 100
Mill downtime, day: 41 SAG downtime, day: 40
Mill throughput, day: 19480 BM 1 downtime, day: 0
Crusher downtime, day: 218 BM 2 downtime, day: 0
Crusher throughput, day: 1899 Gravity downtime, day: 0