AT LAST WE HAVE STARTED!!

Excavation began Oct 1, 2001 on our Penrose property. Foundation work is now underway.

Initial Excavation Footing for our 2nd House
On the 24th of October, the footing for this house was poured. See photo above.
On November 4, the stem walls were poured, and made ready for floor joists.
Stem Walls Poured Nov 4, 2001 Pouring in Process
Nov 10, 2001 Floor Joists were installed and over half of the sub-flooring installed.

Installing Floor Joists Floor Joists Installed Nov 10th

And now, Nov 17th, the framing is up and partially sheeted-not bad
for a single day's work!

Exterior framing put up  Nov 17 about 2:30 P.M. on Nov 17,2001
The following Saturday, Nov 24, the crew installed all roof trusses
and completed sheeting the walls.See photos below.

Front view looking North East Rear view looking North West

Roof Sheeting was finished Dec 1, 2001It was a cold Nov 30th and Dec 1, (in the 40's) and the wind was out in force;however the crew braved the elements anyway and got the roof covered.Shingles will be applied soon, and the inside wall studs installed.
By the 4th of December, after some of the crew worked into the dark evening hours, the shingles were all on. Weather was chilly with strong West winds.



Shingles on -Dec 4 Doors installed Dec 8

More progress followed in the next 10 days, including the front porch addition,and inside wall framing. Also a high percentage of electrical wiring, plumbing, and furnace ducting was completed by the 14th of December.

Concrete Stoop has been poured By the 28th of December, the concrete front stoop had been poured, the swamp cooler installed,electrical and plumbing roughins completed, and the water and sewer lines installed. Windows had been delivered but were not yet installed.