Framing for lot 840 footing

On the 15th of November, 2002 the foundation framing was started on the first lot( #840 ) of two houses we plan to build on the subdivided plot called"Habitat for Humanity Estates" in North Canon City, Co.

This land was previously referred to as "Robbie Lane", but was renamed when the City of Canon City approved the subdivision of four lots and named it "Habitat for Humanity Estates".



Starting the footing on lot 840 Building committee chairman, Tom Hart and a few other volunteers got the footing started
very soon after the lots were excavated.




Stem wall forms are up on Lot 840-Dec 9

This view shows the stem wall forms in place on lot 840, while foundation forms have been poured on lot 842 (the South corner lot)

Finally, the last view shows the stem walls poured on lot 840 and the forms ready for stem wall pouring on the corner lot #842.This photo was taken Dec 14,2002.



Stem wall forms in place for lot 842

This subfloor and walls were done 12/21/02

By December 21, the subfloor and partial external walls were installed on this house on Lot 840. The stemwalls on lot 842 have also been poured. Recent donations and our playhouse raffle will help much now that building supplies are now being invoiced.







Stem Wall Forms off - Lot 842 By the 28th of December, the stem wall forms on lot 842 had been removed, and we were ready for floor joist installation.








Errecting the East Wall Moving on, by the 6th of January, 2003 the floor joists, flooring, and two walls had been installed and errected on the Lot 842 property. A photo of the East wall errection is shown at the left.

A view showing the East and South walls after errection is shown below, as well as the nearly complete enclosure status of both houses looking West on the 16th of January.

Both East and South Walls Up on Jan 4th

View looking North West



View looking North East The roof trusses have been delivered for both houses and are stacked awaiting installation. The interior wall framing is largely completed on both houses.

On the 17th of January the trusses were lifted by crane on top of the wall supports of both houses. It was a sunny day with low wind, so this operation took place with no problems. The crane was a rental machine supplied by Canon Rental.



.

.

.

.

.

.

Crane lifts trusses into place Trusses laid up on top via crane

All trusses installed Roof Sheeting completed on 1/25/03

By Saturday, Jan 18, the trusses were all installed and ready for sheeting and shingling work which began a week later on the 24th and 25th of the month. The temperatures were running in the 40-50 degree range.

Shingling started on Feb 1, 2003

On the 1st of February, the shingling of lot 842 was started. It was almost at 70 degree day, so a lot was done by the work crew to move the project forward.





Lynda and her children put in sweat equity Lynda Schumate and her children Maegan 16 and Jacob 7 all put in some of their sweat equity on the 1st of February when the above photo of their house on lot 842 was taken.


These are the two houses being built at HFH Estates

These houses were wrapped and rough electrical and plumbing installed by the 15th of March, 2003.
Utility sheds for each of them were being built at that time by a group of Canon City Methodist Church volunteers who have partnered with Habitat to support our housing efforts.

Vinyl Siding installation was also initiated on March 15th. Status on March 30th is as shown.