Engineering Economy Analysis 

 

   Home           

 

 

 

 

 

 

 

 

  Favorite Links:

  Search Engine

  Definition

 

 

  Welcome to Engineering Economy Analysis class' website!

IE-22141: Engineering Economy Analysis
Credit hours           : 3 hours
Prerequisite            : Introduction to Economics
Meeting Time         : 3:00 - 5:00 p.m.
        Classroom Number : J-610
Instructor               : K. Gita A.
 

  Download:

 
Steven Darmawan
Yulius Kamto
Eddy Wijaya
Eko
 
Frick M.
Dwi Ardianto
Rudy Sugianto
 
Rusli
Henny
Fandi
Vendy
 
Angga
Marcus S.
Ivan Y. P.
Verri S.
 
Topic:NET ZONE
 
Submission: LATE
 
Notes: Report (-100 pts)
Topic: SHOES COMPANY
 
Notes:  Too many typos in the report (-10 pts)
 
Topic: SOAP MANUFACTURING
 
Submission: ON TIME
Topic: EXOTIC PLANTS
 
Submission: ON TIME
       
 
Daniel
Yohan
Christian Adya
Michael Alexander K.
 
Harry
Jonathan
Arip Teguh
Hendra
 
Roberto
Deva
Gizelo
Willy
 
Faisal
Sutandi
Martinus Rus
Andreas
Topic: BABY SHOP
 
Submission: LATE
 
Notes: Report (-100 pts)Rewrite the first draft and put more information on how you will relate the topic with the materials that you have learnt in the class
 
 
Topic: SUNSET CAFE
 
Submission: ON TIME
 
Notes: Excellent. I have a very high expectation on how your group will utilize Eng Econ Analysis to evaluate the financial part of this project
 
Topic: PILUS
 
Submission: ON TIME
 
Notes: Rewrite the first draft and put more information on how you will relate the topic with the materials that you have learnt in the class. Resubmit it prior 10/30/07.
If you submit it after 10/30/07, 10 pts will be deducted from your grade per day.
Topic: LIDAH BUAYA
 
Submission: ON TIME
 
Notes: NOT APPROVED. The topic is pretty similar with last semester's group, I expect some different approaches otherwise the project grade will be 30% lower.
       
 
Susanto
Christian
Jaka Alamsyah
Indra S.
 
Gheanni
Bun Yacki
Michael S.
Keefe Solomon
 
Freddy
Hendro
Hendrik
Hendra
 
Stevane Fathin
Andres
Thias A.
Herry Lukito
 
Topic: PROPERTY
 
Submission: ON TIME
 
Notes:  The scope is too small. I have a very high expectation on how your group will utilize Eng Econ Analysis to evaluate the financial part of this project
 
 
Topic: WARTEL
 
Submission: ON TIME
 
 
 
 
 
 
 
 
 
 
Topic: FISHING POND
 
Submission: ON TIME
 
Notes: Excellent. I have a very high expectation on how your group will utilize Eng Econ Analysis to evaluate the financial part of this project
 
 
 
Topic: COPYING MACHINE
 
Submission: ON TIME
 
Notes: Excellent. I have a very high expectation on how your group will utilize Eng Econ Analysis to evaluate the financial part of this project
 
       
 
Hadi
Oki Y.
Maylani
Budi
Robert
   
 
 
Topic: LOGISTICS
 
Submission: ON TIME
 
   
 
 
 
 
 

* Group Project Team Assignment

If you believe that there is a mistake in the assignment for your team members, let me know ASAP (before September 1st, 2007)
If you do not have a group yet, either form a new group or join any existing group which has not violated any of the regulation below.
 
Regulation in forming a group:
       - Each IE group must have max one female IE student
       - Maximum 4 students in each group
 
Failure to follow the instruction in forming a group will result in 10 points deduction from your group project grade.
(Bila tidak mengikuti peraturan dalam membentuk sebuah group maka 10 poin akan dikurangkan dari total nilai group project).

 

Date Topics Readings Assignment
8/15/07  
Introduction to Engineering Economy (Cash-flow game)
  Cash flow game
8/22/07 Basic, Concepts, Terms, and Graphics Chapter 1  
-  Read chapter 1
 
-  Report of cash flow game is due at
   the beginning of the class
 
8/27/07  
Symbols and their relations (substitute for Mr. Wayan's class)
8/28/07
 
IMPORTANT:
FREE International Seminar at Atma Jaya University about Globalization on Labor Forces and Inequality Effect on Economy.
 
Date: 8/28/07 from 9 - 12 p.m.
Date: 8/29/07 from 9 - 12 p.m.
 
IE students are encouraged to attend the Tuesday seminar. ME students are more than welcomed to attend the seminar as well.
 
More information on these seminars, please contact Mr. Wayan. He has the ads.
8/29/07 Basic Engineering Economy symbols and their relations

Interest Rates (compounding)

Chapter 3

BRING YOUR SAVING BOOK

Group project assignment, download the information regarding this assignment above.

Each student is required to bring a copy of the Interest Factors (table 1 through 29) from the back of your book. 

9/05/07 Factors and Their Use in Multiple Factors Chapter 4
 
Starting this week, each student/group is required to bring a copy of the Interest Factors (table 1 through 29) from the back of your book. 
 
I will not allow you to join the class if you do not bring the interest factor tables.

Group project assignment, download the information regarding this assignment above.

- Cell phone Etiquette part 1 and part 2 (MUST READ)
 
- Winner for the competition no. 1 is
Thias, Verri, and Andres (although I am a bit suspicious coz they got a perfect score...)
9/10/07  
Present-Worth & Capitalized-Cost Evaluation
Equivalent-Uniform-Annual-Worth Evaluation (substitute for Mr. Wayan's class)
9/12/07 Class is CANCELLED  
 
- First draft of the group project due on Wednesday 9/12/07 at 3:00 p.m.
 You can either email it to me (the most convenient way) or drop it off in my mailbox.
Failure to submit on time will result in:
 
- 10 pts deduction for your first draft
   report grade if you submitted no later
   than Wednesday 9/12/07 5:00 p.m.
 
- 25 pts deduction for your first draft
   report grade if you submitted no later
   than Thursday 9/13/07 5:00 p.m.
 
- 65 pts deduction for your first draft
   report grade if you submitted no later 
   than Friday 9/14/07 5:00 p.m.
9/19/07  
Present-Worth & Capitalized-Cost Evaluation (Cont'd)
Equivalent-Uniform-Annual-Worth Evaluation
(Cont'd)
Chapter 5
 
Chapter 6
 
 
9/25/07
Review
   
Do these exercises at home then we will discuss the one you cannot do in class
TIME: 11:00 a.m. - 1:00 p.m.
10/1/07
MIDTERM
 
Study Hard!
10/10/07
Discuss the MIDTERM
 
 
10/17/07
Rescheduled
 
Reschedule to 10/30/07
at 11:00 - 1:00 p.m.
10/24/07 Rate of Return of a Single Project Chapter 7  
10/30/07
Rate of Return of a Multiple Projects
Chapter 8 CLASS TIME: 11:00 - 1:00 p.m.
10/31/07
Break Even Analysis
Chapter 10
 
11/07/07
Depreciation
Chapter 13  
 
Replacement Analysis
Chapter 16  
 
GROUP PRESENTATION
 
 
Final Report is due
GUIDELINES to write final report
 
Examples on how to write a good project report:
 
(you can drop the acknowledgement section)
 
UC Berkeley
Cornell University
University of North Carolina
Stanford
 

NOTE:

  • It is your responsibility to check periodically for any updates
  • It is also your responsibility to print out any necessary documents needed prior coming to the class
  • You may need a password to open the documents.