Phase 2 will consist
of 5 parts:
- Layout of "village".
- Construction of housing and
group facility.
- Construction of workshops
and animal facilities.
- Construction of agricultural
products processing facilities.
- Development of large group
camping area and facilities.
Although the structures and
general site appearance should continue to be medieval, this
stage will make lots of use of modern equipment in order to expedite
progress.
Part 1. Layout of "village":
- survey
- site preparation
- lay out placement of main
structures
Part 2. Construction of housing
and group facility.
- Tavern/inn
- design and bid procedure
- construction
- Other housing: 2 preliminary
structures designed as general medieval town dwellings with ability
to bunk several people. Future use might be as a dwelling, dwelling/shop,
or a summer labor bunkhouse. Eventual village size to be about
12 to 15 structures.
- Drill well.
- Waste management will be
with Clivus Minimus composting toilets.
Part 3. Construction of workshops
and animal facilities.
- Machine shop for onsite repair
of equipment
- Structure(s) for equipment
storage
- Woodworking shop, armorer
- Facilities for horses, a
cow, a few goats, rabbits, chickens.
Part 4. Construction of agricultural
products processing facilities.
- Grain and produce processing
- Meat processing
Part 5. Development of large
group camping area and facilities.
- Clear pasture: 2 to 3 acres.
- Build picnic pavilions, outhouses,
showers.
- Develop parking area.
|