Town of Inlet's
Town Comprehensive Master Plan

Updated July 11, 2003
Questions or Comments?
Email the Inlet Supervisor at inletsupervisor@eagle-wireless.com






Infrastructure and Services
1. GOAL: Provide the necessary infrastructure and services to the Inlet property owners, residents and visitors in a cost-effective manner.

a. ACTION ITEM: Conduct a study to identify all problem properties with subsurface contamination, brownfield and wastewater problems and/or inadequate septic and well separation.

RESPONSIBLE FOR IMPLEMENTATION:

f. ACTION ITEM: Create water and/or sewer districts to serve properties with wastewater problems and/or inadequate septic and well separation problems.

RESPONSIBLE FOR IMPLEMENTATION:

g. ACTION ITEM: Hire an engineering firm to design water and/or sewage systems.
Note: See Appendix for “Town of Inlet Request for Proposals for Engineering Services Planning for Wastewater Collection and Treatment Facility.”

RESPONSIBLE FOR IMPLEMENTATION:

h. ACTION ITEM: Develop funding to finance the building of water and/or sewer infrastructure.

RESPONSIBLE FOR IMPLEMENTATION:

i. ACTION ITEM: Build and operate the water and/or sewage systems.

RESPONSIBLE FOR IMPLEMENTATION:

POTENTIAL CONSEQUENCES OF INACTION: Permits to expand businesses will continue to be denied by the State of New York Department of Health because there is not sufficent space in the hamlet area to allow for expansion of septic systems, due to close proximity of water supplies. Residents may be at risk of disease from drinking water from contaminated wells due to septic systems that are too close to wells and of unsatisfactory condition. Treatment of these contaminated wells such as filtering and disinfecting the water to remove or destroy microbiological contaminants is not practical or economical for most residents leaving no alternatives. Seventh, Sixth, Fifth and Fourth Lakes are gradually being contaminated with Fourth Lake already showing evidence of deteriorating water quality putting swimmers at health risk.

j. ACTION ITEM: Partner with adjacent communities to develop continuous sidewalk network.

RESPONSIBLE FOR IMPLEMENTATION:

k. ACTION ITEM: Complete the sidewalk network.

RESPONSIBLE FOR IMPLEMENTATION:

2. GOAL: Ensure that Emergency Services will have the capability and resources to respond to and serve all emergency calls.

a. ACTION ITEM: Hire full time and part time emergency services personnel.

RESPONSIBLE FOR IMPLEMENTATION:

b. ACTION ITEM: Compensate emergency services volunteers on a per call basis.

RESPONSIBLE FOR IMPLEMENTATION:

c. ACTION ITEM: Recruit and train new emergency services volunteers.

RESPONSIBLE FOR IMPLEMENTATION:

POTENTIAL CONSEQUENCES OF INACTION: Diminished ability of emergency services to respond to emergency calls, putting people's lives in jeopardy.

3. GOAL: Ensure that there are adequate public restrooms year round that are easily identified.

a. ACTION ITEM: Identify the restrooms at Fern Park and at Inlet Town Hall as open in the winter.

RESPONSIBLE FOR IMPLEMENTATION:

b. ACTION ITEM: Erect signs directing the public to restrooms.

RESPONSIBLE FOR IMPLEMENTATION:

POTENTIAL CONSEQUENCES OF INACTION: The public will continue to be unaware of the existence of public restrooms and will be inconvienced by limited access to year round public restrooms.

4. GOAL: Maximize the salvage and recycling of waste products.

a. ACTION ITEM: Find and contract with a vendor to purchase these potentially recyclable waste products

RESPONSIBLE FOR IMPLEMENTATION:

POTENTIAL CONSEQUENCES OF INACTION: Many potentially recyclable waste products will continue to be disposed of as trash adding to landfill volumes and unnecessary depletion of natural resources.

5. GOAL: Provide collection capability and/or information to dispose of hazardous products.

a. ACTION ITEM: Find and contract with a vendor to receive and dispose of hazardous waste products dropped off at the transfer station either on designated days or on any day with storage provided between vendor visits.

RESPONSIBLE FOR IMPLEMENTATION:

POTENTIAL CONSEQUENCES OF INACTION: Inlet residents will continue to have no place to dispose of certain "hazardous waste".

6. GOAL: Ensure reliable phone and high-speed internet access, digital television and reliable wireless phone service for normal and emergency communications.

a. ACTION ITEM: Capital Net should provide additional modems for internet access.

b. ACTION ITEM: Adelphia should provide fiber optic service for high-speed internet access and digital television.

c. ACTION ITEM: Eagle-wireless should expand service area for internet access.

d. ACTION ITEM: Verizon and Cingular should be encouraged to build cell phone towers/transmitter – receivers in the Town of Inlet.

POTENTIAL CONSEQUENCES OF INACTION: Internet users will continue to have periodic delays in getting access, will continue to get annoying disconnects, and will have slow data transmission. Cell phone users will not have services in most areas of the town and emergency calls can not be made from remote areas.

7. GOAL: Ensure adequate day care services for children.

a. ACTION ITEM: Encourage the establishment of childcare facilities in Inlet.

RESPONSIBLE FOR IMPLEMENTATION:

POTENTIAL CONSEQUENCES OF INACTION: Parents will continue to be limited in their ability to work and/or pursue other out of home activities.

8. GOAL: Ensure reliable electric service at reasonable prices.

a. ACTION ITEM: Install hydroelectric generator at the Sixth Lake dam while being repaired or in the future.

RESPONSIBLE FOR IMPLEMENTATION:

b. ACTION ITEM: Develop an electric generating wind farm.

RESPONSIBLE FOR IMPLEMENTATION:

c. ACTION ITEM: Take over local transmission facilities.

RESPONSIBLE FOR IMPLEMENTATION:

POTENTIAL CONSEQUENSES OF INACTION: The cost will continue to be high and service will continue to be unreliable.






Questions or Comments?
Email the Inlet Supervisor at inletsupervisor@eagle-wireless.com








Didn't find what you're looking for?
Want to start your own site?
Join Yahoo! GeoCities


Copyright © 2001 Yahoo! Inc. All rights reserved.