8/9/03: Almost ready to pour. Double plywood walls with about 1000 steel tie straps between.
The platforms are so the crew can direct and level the concrete as its poured. Lots of rebar in
the long lower support wall. Just a single large rod in each of the other walls near the top
since their much shorter length from corners is much stronger.