9/13/03: The first floor subfloor only took two days! And thats for 38 sheets and about
1600 screws besides gluing. Sure will be nice to have a flat surface to work from. Also, notice
the electric meter! Absurdly ugly wiring, but the utility squeezed in the installation
as one of their last on Friday. Just in time for the air compressor to run the nail gun for
nailing the walls. At approximately 80 nails per sheet of plywood, thats some time and arm
savings.
Riverhouse page