|
|
|
|
New
Floor, New Windows, Fresh Paint for the CE Building - 2009 |
 |
 |
New
floor tiles and a coat of fresh paint brightened the old
building!. |
The
ceiling tiles were patched, and the lights replaced with new T5's. |
New
Roof on the CE Building - July, 2006 |
 |

|
We
couldn't delay any longer; the shingles were blowing off the roof of
the CE Building with every storm. |
The
winning quotation came from our next-door neighbours, Roof-Rite. Having
watched them at work, we are prepared to acknowledge that the company
is well named and our building is well roofed. |
Fresh
Paint for the Sanctuary - 2006 |
 |
 |
Have
you seen the repainted sanctuary? In March the walls were redone in an
off-white shade called "Buttermilk" and the pews were repaired and
touched up. It's beautiful. |
New Doors - 2005 |
 |
 |
The
battered old doors on the CE Building were letting in too much cold air
and rainwater. In June 2005, they were finally replaced with new
glass doors. The consensus is that appearance has been greatly
enhanced, along with functionality. |