WHAT'S HAPPENING AT MERIVALE?
New Floor, New Windows, Fresh Paint for the CE Building - 2009
Painting the hall Repairing the ceiling.
New floor tiles and a coat of fresh paint brightened the old building!.  The ceiling tiles were patched, and the lights replaced with new T5's.
New Roof on the CE Building - July, 2006
Shingles going up On the roof
We couldn't delay any longer; the shingles were blowing off the roof of the CE Building with every storm.  The winning quotation came from our next-door neighbours, Roof-Rite. Having watched them at work, we are prepared to acknowledge that the company is well named and our building is well roofed. 
 Fresh Paint for the Sanctuary - 2006
Painting the sanctuary Painting the church
Have you seen the repainted sanctuary? In March the walls were redone in an off-white shade called "Buttermilk" and the pews were repaired and touched up. It's beautiful.
 New Doors - 2005
Old Door Going Out CE Building with new doors
The battered old doors on the CE Building were letting in too much cold air and rainwater. In  June 2005, they were finally replaced with new glass doors. The consensus is that  appearance has been greatly enhanced, along with functionality.