 |
In case of vessel
aground, I will take the following actions to re-float the vessel:
 |
Calculate height of
tide and time of rise and fall.
|
 |
Reduce draught of
ship by:
 |
De-ballasting
|
 |
Jettisoning cargo
|
|
 |
Use main engines to
maneuver.
|
 |
Obtain assistance
from port authority, coast guard.
|
 |
Get assistance from salvage
tugs.
|
|