Make a pre stowage plan. |
![]() |
Get cargo information from the shipper. |
![]() |
Calculate the stability criteria complies with the requirement of International grain code. |
![]() |
Planning, calculation and loading to be made for ship's stability at all stages of loading. |
![]() |
Clean and prepare cargo holds for loading grain. |
![]() |
Clean and test cargo hold bilges. |
![]() |
Check weather tightness of hatches. |
![]() |
Check cargo handling gears in good operational condition. |
![]() |
Initial draft survey to be carried out before loading grain. |
![]() |
Load grain as per cargo stowage plan. |
![]() |
Follow loading sequences. |
![]() |
Check stresses on hull are within the limit. |
![]() |
Trimming of cargo to be carried out as per loading plan. |
![]() |
Precautions to be taken for grain dust to protect human hygiene and equipments. |
![]() |
Check cargo for any sort of damage. |
![]() |
Check cargo for infestation. |
![]() |
Check moorings at frequent intervals. |
![]() |
Securing cargo as per grain code, to reduce grain heeling moment. |
![]() |
Fumigate the cargo using pesticides if required. |
![]() |
All cargo holds to be closed and properly secured. |
![]() |
Prevent entering of sea water during adverse weather condition. |
![]() |
Take proper draft and calculate loaded quantity by final draft survey. |
![]() |
Calculate final state of stability after completion of loading. |
![]() |
Check humidity and adjust ventilation if required. |
![]() |
Regular sounding of bilges. |
![]() |
Ensure ship's stability is maintained. |
![]() |
Inspect securing arrangements regularly if possible. |