|
|
Approval required from dry dock authority. |
|
|
Same normal precautions for loading heavy lifts. |
|
|
Preferably load by dock yard crane if available. |
|
|
Side shores to be added to prevent vessels heeling over. |
|
|
Consider stress on ship's structure. |
|
|
Add additional keel block, bilge block, side shores if necessary. |
|
|
To prevent structure to be overloaded, DB tanks below hold where cargo is being loaded, may be ballasted. |