Before safety construction survey, followings to be checked:
![]() |
Structural strength of the vessel is good. No part of deck or hull is not badly corroded. |
![]() |
Water tight doors are in good condition. Remote and local controls working properly. |
![]() |
Bilge pumping and drainage arrangements are in good condition. |
![]() |
Electrical equipment and installation |
![]() |
Emergency sources of electrical power |
![]() |
Electric and electro hydraulic steering gears |
![]() |
Precaution against shock, fire and other hazards of electrical origin |
![]() |
Fire protection arrangements, fixed and portable fire fighting equipment are well maintained and in good operational condition. |
![]() |
Boilers and machinery |
![]() |
Means of going astern |
![]() |
Shaft |
![]() |
Boiler feed system in good condition. |
![]() |
Steam pipe systems in good condition. |
![]() |
Air pressure systems are in good condition. |
![]() |
Cooling water systems are in good condition. |
![]() |
Fuel, lubricating and other oil systems are in good condition. |
![]() |
Means of communications are in good condition. |
![]() |
Steering gear |
![]() |
Anchor chain and cables |
![]() |
Means of escapes are well maintained and in good condition. |
![]() |
Means of stopping machinery |
![]() |
Shutting off fuel suction pipes |
![]() |
Closing of openings |
![]() |
For specialized tankers and UMS ships, additional items. |
Checklist and preparation for safety construction survey may be found in company's ISM manual.