Ship’s stability condition to be kept as close as to that when she is entering in the dry dock. |
|
|
Enough GM and positive stability during critical period. |
|
|
No changes of weight to be made without the consent of the dock-master. |
|
|
Movable weights to be secured. |
|
|
Minimum free surface effect and no list. |
|
|
All plugs to be secured. |
|
|
Anchors stowed and secured. |
|
|
All overboard discharges secured. |
|
|
Anodes fitted. |
|
|
All pipings, cable connections with shore disconnected. |
|
|
Start gyro, check heading. |
|
|
Inform E/R when flooding dock. |
|
|
Check for water tightness. |
|
|
Sound all tanks. |
|
|
Following times to be logged down: |
|
|
Flooding commenced |
|
|
Vessel floated |
|
|
Dock gate opened |
|
|
Vessel left dock. |
|
|
Check operation of all equipments. |
|
|
General cleaning and washing |
|
|
Normal sailing checklist. |
|
|
Check water tight integrity of the vessel. |