The ceiling is suspended on rubber mounted isolation clips | ||||||||||
the isolation clips hold the furring channel which holds the 5/8 drywall | ||||||||||
![]() |
||||||||||
![]() |
||||||||||
Finally the second wall and ceiling are drywalled and ready for taping | ||||||||||
Giant leap ahead with the taping done, sanded, primed, painted, and glass block installed in the windows. I installed Thickset 60 glass block as it has a STC of 48 and would make the windows as sound proof as possible Also I am in the process of installing the ash flooring. More to come soon as I tackle the doors and final trim |