6. Conclusion
1) The NEERI EIA
and the TFR have not consulted the recent studies on the sedimentation dynamics
of the Project Area (Palk Bay).
2) They have
totally neglected the number one risk factor in the Project Area, namely
Cyclonic disturbances.
3) The EIA has
analyzed (albeit partially) the sedimentation dynamics in the Adam’s Bridge
area of the Palk Bay only. It has ignored totally, the sedimentation dynamics
in other parts of the Bay and especially in the Palk Strait area where the
northern leg of the channel is to be dredged.
4) The
substratum of the northern leg of the channel is yet to be studied. The study
is important as it will reveal the method of excavation (dredging or blasting)
for this part of the channel. Knowledge of the nature of the material excavated
or dredged is necessary for planning safe disposal strategies.
5) Plans to
identify dump sites that will be safe to the environment around and will have
the capacity to withstand the harsher realities of the environment are yet to
be drawn.
6) Micro area
sedimentation studies within the Palk Bay are absolutely necessary for planning
a safe and stable channel design, navigation course, dredged dump and auxiliary
structures.
7) The EIA and
the TFR are incomplete in their content in the above said parameters.
8) The Expert
Committee formed by the Ministry of Environment & Forests has cleared the
project recently. However, keeping the issue of the honor of our Nation and the
future costs of possible failures, the Committee should muster the courage to
withdraw its decision of clearing the project.
9) If the
MoE&F fails to overcome its departmental ego, the Tamil Nadu Pollution
Control Board should muster all its energies to wean the central ministry from
its delusion.
10)
Both the MoE&F and TNPCB should direct the Tuticorin
Port Trust to withdraw the EIA and TFR as they are incomplete in their content
in the above said parameters.
11) They should request the Central and the State Governments to direct and encourage the institutions (like NIO, NIOT, IMD, GSI, Anna University, Institute of Atmospheric Sciences) involved in basic researches to take up studies that would have the capacity to throw more light on the environmental dynamics of the Palk Bay. They should direct the TPT to ask NEERI to come out with a thorough Environmental Impact Assessment and Technical Feasibility Reports in the future.