We had some changes made to the side of the house. Thats where the R.V. park and dump station are. We had a concrete 'hard stand put in and a wall. Then had gas and elect installed along side the new B.B.Q patio. The B.B.Q will be in before summer.

page-4



After leveling the ground and putting up the forms and running the gas and electric lines, they called in the cement mixer.

The crew getting the cement nice and level.

They combined the 'RV' hard stand and the BBQ patio in one pour.

Laying the first row of bricks for the wall.

The wall is going up.

Here is the completed wall.  The next thing we had to do is texture the patio to look just like the surface that goes around the pool.

We had the area around the pool power washed and then they put douw a 'stain and sealer' and the surface
of the patio was textured and stained and sealed the same color.
The next thing that has to be done is to have a nice BBQ work station installed.
Something like the one I built in Pacifica but nicer.

One task that I actually did was to re-run the down spout from the roof. I had to run it over the wall so the water would drain to the street.

Can't wait to get the BBQ in.