Procedure to Load RIMLIB to DASD
- Sign onto SMP/E
- Choose option 5 – Receive
- Choose option 5 – CBPDO Tape
- Choose option 3 – Load RIMLIB file to DASD
- Enter <vol ser> of first PDO tape
- Verify tape unit is <tape> and press <enter>
- Enter <rimlib> dataset name
- Verify other space allocations and press <enter>
- Press <PF3>
- Press <PF3>
- Choose option E – Edit
- Change LABEL=(2,SL) to LABEL=(2,SL,EXPDT=98000)
- Press <PF3>
- Choose option S – Submit