Site LAN Wiring Plan & Physical Topology

[ LAN User Requirements Document | Site LAN Logical Topology | Wiring Closet Diagrams | LAN Electronics Spreadsheet | LAN Media Spreadsheet | IGRP Implementation | ACL Implementation | IPX Implementation | LAN Pros & Cons | Back to Main]

 

Room Numbering Scheme

 

One MDF and two IDF will be used in the implementation of the Sunset network.

The interior walls are painted with fire retardant paint and have 3/4" plywood which is raised 1 1/4" from the walls where equipment is mounted. Fifteen feet of wall space is provided for the POP terminations. The drop ceiling has fixed ceilings installed to prevent unauthorized access. 12" ladder rack and 4" conduits have been installed for horizontal and vertical cabling. Water and steam pipes do not run through or above the wiring closets and the humidity is maintained between 30% and 50%. Room temperature is maintained at 70 degrees. Incandescent lights have been installed.

 

Equipment:  

MDF-

 Cisco 2621 Router with two Fast Ethernet ports and one T1 CSU/DSU

Cisco 2621 RJ-45 Tranceiver

Cisco 2621 Fiber Optic Tranceiver

3 Catalyst 1924 Ethernet Switches(WS-C1924-EN)

Catalyst 1900 Enterprise Edition with 24 10BaseT, 2 100BaseFX ports

4 24-port patch panels

1 8-port patch panel

Administrative server

Application server

DNS server

E-Mail server

Library server

Science server

Ladder rack

 

IDF-

 3 Catalyst 1924 Ethernet Switches(WS-C1924-EN)

Catalyst 1900 Enterprise Edition with 24 10BaseT, 2 100BaseFX ports

4 24-port patch panels

1 8-port patch panel

Ladder rack