Jesses barn under construction and is now FINSHED

Jesse and Greg are now working on a project in the barn. A 16 foot long 10 foot wide fun box. With a small ledge on the right side with angle iron and a rail on the top of the middle. Here are some pictures and this will be updated every now and then. The basement is now gone now the start of the barn...

and here are those pics....

Before...

Greg Get hur cut greg

Jesse Dassed

Jesse

Our work!

Greg

After...

Angle 1

Angle 2

Angle 3

Angle 4

Angle 5

Now finshed, skating long into the night warm in a barn with a kick ass fun box, that is now 27 feet long with the ledge down and along the top of the fun box. With two drop in quaters to get speed that are 4 feet tall and 10 feet wide. Well lets skate after 2 weeks of work...