![]() Jeff Boucher, the concrete contractor did not show up as planned in early June, so Rick and Ed built a footer, including this massive section in front of the wine cellar. It took about a day and a half to construct the footer. |
![]() On the afternoon of the second day, Chad got to put Martha's used motor oil on the forms. Note to building inspector: two rows of rebar. |
![]() The concrete truck arrives under Nancy Higby's watchful eye. |
![]() The massive front of the wine cellar is filled ... |
![]() and the truck continued around the perimeter. |
![]() Finally, Rick wheeled concrete to the piers. |
![]() Rick finishes the screeding. Chad did all but the last five feet, but when it is your house, your camera, and your website, you get the photo op. |
![]() Ed installs the shear connectors every 4 feet to anchor the wall to the footer. |
![]() Our driver (also named Rick), did a great job. The all wheel drive, front discharge truck made this as easy as concrete work can be. That's still not very easy. |
![]() The crew celebrates their careful calculation of the required concrete. Ed, being a true carpenter, only writes on boards. The calc said 10.6 yards. We ordered 11 and had a wheelbarrow leftover. Those with good eyes will note a bit of concrete on the bank in the background. |
![]() The tools get cleaned up. |
![]() The finished product after backfilling and with cleats for the walls and the main beams. |
Jump to: the next phase | the new house page | Our Geocities home page | KC Travel Site
Last updated 30 June 99