What's new ?, Trends
Paper on ILUD as the Indonesian Land Use Databank

National Closing Workshop of LREPP-II/B: Land Use Mapping in Indonesia; Denpasar, April 23-25, 1997:

Appropriate Information Technology at BPN/PGT


ILUD: Development of a Database Application for Land Use Data

by G.Bechtold, Information System Specialist, LREPP-II/B


    Keywords: Land use planning, GIS, BPN, ILUD, land use mapping, land use monitoring, spatial land use planning, land allocation, automization, standardization, GIS production, GIS diffusion

    Abstract: In the framework of project LREPP-II project, an automized, customized GIS and database system for land use mapping, land use monitoring and land allocation has been setup: ILUD, Indonesian Land Use Databank. It includes user-interfaces, standardization and convention codes. The main components of ILUD: application of the methodology, definition of standards and data dictionaries, software modules, standard output, and the further interpretation of the data, are explained in this paper. The procedure to use digital data for spatial land use management planning is integrated in ILUD. Main target of this ILUD system is to support decision makers at defining land use plans, and to implement and to monitor land use changes after land use planning.


1 Introduction: LREPP-II/B

Project LREPP-II/B has been set up to collect data on land use in the frame of LREPP-II. 42 priority areas have been surveyed in 18 provinces with an allover area of some 4 Mio.ha. A methodology has been developed how to collect data for land use mapping from aerial photographs and from satellite images, with support of data collected in the field.

Some 250-300 land use maps have been compiled following this method. Digital data exist for all these areas. It was always considered as very important to have all work executed in a homogenous work approach and data being available in the same digital format.

This achievement is a strong base for the setup of a land use databank which will serve for land use data on a nationwide frame.

In this paper, it will be shown, what is ILUD, what ILUD can be used for, and which direction ILUD will have to be active in the coming years. The detailed procedures and techniques of ILUD processing will not be explained here: They have been presented, taught and documented in a series of manuals, publications and on-the-job training courses. For the functionality of ILUD, information is available on the Internet at address http://www.oocities.org/Tokyo/2439/.

2 Why ILUD ?

Need for homogenous, comprehensive, digital system approach

Geographical databases provide a foundation for the planning and implementation of development which is sustainable in environmental and social terms. Modern planning methodologies require multi-sectoral analyses and these in turn require a broad and up-to-date database. ‘Improving the quality of the information supplied to planners, policy and decision makers will improve the quality of planning and implementation of development oriented activities’ (Ir. Soni Harsono, State Minister of Agrarian Affairs/BPN, Conference on ‘The Role of Geographic Information System for Enhancement of National Spatial Planning’, 21/10/1996).

In the past, it was possible to draw land use maps and land use plans manually and with much emphasis on existing long-term expertise. For the future, new methods have to be applied, as pace of development is faster and the need for appropriate land use planning is stronger and more urgent.

Thus, appropriate land use data and plans have to be compiled much faster. Efforts to ensure their implemention and monitoring become more important. There is a ‘move towards more flexible type of planning. Planning procedures have to be established to be more responsive to dynamic situations.’ (Ir. Soni Harsono, ibd).

The planning and implementation of appropriate use of land has to be based on correct assessment of current, potential and future land use, and - in combination with the above mentioned urgency of land use planning efforts - on a digital approach with an information system.

GIS will be imperative for land use planning. In the not so far future, it will be clearly recognized that land use must be planned very carefully by optimizing the land use of the shrinking natural resources for a growing population. No spontaneous, exploitive and destructive land use can be afforded by the human community any longer, whether it is caused by innocence, struggling for survival or plain greed. The rules for land use will be set and monitored rigorously by planners who clearly depend on sophisticated GIS expert systems !

One fast, comprehensive, digital approach had to be applied in LREPP-II/B and in BPN/PGT, which is well defined and portable:

A ‘1-system approach’ - a system, that can be used in all provinces and produces data and output of the same standard and of the same quality, to be used by BPN or other agencies for the purpose of land use planning and monitoring.

The acceptance of standards was particularly important for following reasons:

  • As a ‘national’ approach to land use planning, it was not accepted to work with different data sets and formats in the different provinces.
  • In an administratively hierarchical structure, it must be possible to read and ‘open’ data at different hierarchical levels, in different offices.
  • The project with the developed methodologies is understood as a pilot application, which is to be followed by a nationwide data collection.
  • Data are fed to a central storage unit from where they can be retrieved and be used for analysis and interpretation. Such a data pool can only be functioning if standards, structures, data qualities and data dictionaries are defined, controlled and maintained in a supervised, centralized way.
  • For the goal of land use planning and use of land use data by other Government agencies, it is crucial to have data encoded in a clear, transparent, documented, homogenous way, following principles of database setups.

Preconditions for the implementation of a databank were:

  • User-friendliness: Except a very few permanent users of GIS, most of the users (technical staff to enter and compile data, or management to retrieve or query data) are not permanently working with GIS applications. Most users do not have previous GIS experience. Thus, processing steps and commands have to be easy, and - as far as possible - automized. Command line level was not acceptable. The system had to work on a user-interface, which can be applied at all BPN offices.
  • Standardization: It was not acceptable, that different codes, different technical approaches, different file names, different file structures etc. would be applied. In such a case, data can not be transferred from one province to another, not to headquarter, and not to other agencies. If data can not be used and can not be transferred to other users, they are considered as being useless.
  • Performance: To fulfill the requests of fast, reliable, transparent data processing to satisfy and to support the decision makers in their difficult task of land use planning, it is obvious, that such a system has to run smoothly, can cope with large amount of data and that it can perform much faster and more accurate than the manual approach.

Above mentioned requirements were expressed to define a ‘system’, which can process the collected data for land use mapping, can execute further analysis of these data for planning procedures and which - very important ! - can handle large amount of data in a structured way: The idea of ILUD as the ‘Indonesian Land Use Databank’ was born.

Over a period of more than two years (1994-96), with many discussions, workshops, meetings and feedback from provinces and regions, a system has been developed, which fulfills these preconditions, and which shows full viability.

Following chart shall help to understand the idea of an instutionalized GIS:

Fig.1: Components of a GIS (Core and Frame Components)

GIS components

The allover aim is to help decision makers with well based, well interpreted information.

There are many advantages of digital inventory and interpretation of land use data for land use planning, as outlined before: The system is fast, easy to modify, capable of running different scenarios and models, can store large amounts of data, is flexible for individual, specific requests and retrieval, can be accessed at many places simultaneously, can be updated with new data types and data sources within very short time, etc.

ILUD is seen as an integrated package which enables easy switching between the individual components, under the main objective of producing structured data in large quantities, which can be directly used for land use planning.

3 What is ILUD ?

Components of the System

The components of these considerations for the application of an institutionalized, established, professional information system are expressed in the following chart:

Fig.2: Components of ILUD

ILUD components

The first four components are vital for the setup and functionality of a system - and have been fully established in LREPP-II/B. The latter two are important for the appropriate use of the data and application of the system in future.

3.1 Concept:

A concept is necessary at the highest level (and as the start) of any data processing activity. This has been explained by the previous speaker and shall be only summarized in Figures 4 and 5.

The methodologies are summarized in the Annex.

Fig.3: Levels of Project Execution

GIS project levels

Fig.4: Land Use Mapping Concept (ILUD Cycle) for Assessment of Current Land Use

Land Use Mapping Concept

Fig.5: ‘Spatial Land Use Management’ Concept (ILUD Cycle) for Allocation of Location Permits and Its Monitoring

Spat.Land Use Planning Concept

3.2 What is necessary for ILUD ?

Importance of Standardization

It is crucial to have classification systems as well as data dictionaries, which define codes !

‘Without standards, there is no system ! Without a system, there are no standards !’

This refers to land use data (e.g. land use classification, description of land use) as well as to non-land use data, such as road classification, etc.

For the functionality of any database, this is the most important aspect. To keep the data ‘alive’ and to make them ‘useable’, these classification systems and data dictionaries have to be used by anyone when generating and compiling the data, so the data can later be used by everybody - and not only by the staff which entered the data.

If data are not standardized, uniquely structured and catalogued with their metadata, there will be the situation of ‘having an ocean of data, but only drops of information’. It is important to guarantee that all GIS data are in a well structured, transparent system.

A standardized information system has been established nationwide. The main goal was to avoid that staff in the many offices of BPN would develop their own ideas up to that point that in every office different codes and different data 'systems' will be used. It even has happened that in the same office, from operator A to operator B, no exchange of data was possible ! This had to be prevented by any means !

Therefore, a complete set of data standards (‘Technical specs’) with definitions on:

  • Land Use Classification
  • Data Dictionary
  • File Names
  • File Structures
  • Directory Structure
  • Grid
  • Software
  • Planning Procedure
  • Map layout with colors
  • Fuzzy Tolerance

has been defined.

All data entry and processing operations follow the same procedures (i.e. the concept), have the same coding (e.g. land use classification codes, road classification codes etc.), follow the same file naming syntax, have the same file structure in each component, geographical references are unique, their map sheet numbering system is structured and geometric, etc.

All this is 'transparent': Any data user and data owner of BPN / ILUD data can have a look at these standards and conventions. They are documented in software manuals, guidelines, training manuals,

Docs

and at address http://www.oocities.org/Tokyo/2439/iludes.htm in the Internet.

The land use classification, as the core of the data dictionary, is a hierarchical, structural classification system, which can be extended for larger scales, i.e. at urban areas, and which has been defined to satisfy the requests of future users, i.e. the purpose (the need !) to use these data for land use planning.

One remark on the classification: While it is important to have a standard classification that users are familiar with and can work with, it does not mean that a GIS has to rely solely on those classes. In ILUD, there is an extended textual ‘attribute’ database (DBMS) behind the classification and behind the standard map display. This will become more important in future, when more specific requests will be made for specific land use mapping features, such as query requests for display or statistics for one specific land use type.

3.3 How to execute ILUD ?

Software Modules

The above mentioned concept and standards can only be guaranteed by introduction of a user interface. This is the only ‘safe way’ to implement standards. The user interfaces guide (and enforce) the user to apply the standards - and not any irregular, self-defined references.

In ILUD, all operators follow a well established sequence in their tasks of data entry, processing and retrieval. The rather complex chart of the concept (see Figs.4 and 5) comes down to an easy-to-follow, step-by-step routine. The software interfaces have been developed to restrict to the necessary, essential functions, to guide in a object-oriented way through the process - and the various software.

This is highly recommended because many (GIS) software packages of today are overloaded with functions, which makes them powerful at one side, but dangerous on the other side for the institutionalization by an agency. Staff will be inclined to ‘play around’ with too many functions, and loose the view on their task ! It can easily happen, that people are 'dragged away' by all the nice, but rather useless pictures on- screen in true colors and with high resolution, at the 'state of art'.

Such a stream-lining of the procedures is necessary in an implementation and production scheme.

Fig.6: Application Setup of ILUD

Application Setup

Beside the ‘stream-lining’ effect, the user interface had to be most user-friendly. As assessed earlier as a precondition of the project, the system has to be applicable ‘on ease’ by the staff.

The only menu options to be answered are of general nature, which can be understood by the staff easily after a short introduction to the system: Questions such as which year, which province, which printer, with or without annotations on the plotted map, which generalisation level etc. (see following Figs. 8-10).

Fig.7: Sample Screen for Data Entry to DBMS

DBMS Entry Screen

Fig.8: Sample Screen for Data Entry to GIS (Digitization)

GIS Entry Screen

Fig.9: Sample Screen for Data Retrieval

Retrieval Screen

Introduction of this easy, user-friendly interface was a 'must' to establish a GIS in a large organization with decentralized structure, but with the request for a nationwide unique technical approach. In LREPP-II/B there was no alternative to the full software ('user interface') environment, the 'application development'.

To give an idea of the magnitude of the user interface software: Some 800 pages (1462 kB) of source codes for the GIS (sml files), some 500 pages (916 kB) of source codes for the DBMS (prg files), some 50 pages (78 kB) of other source codes (Pascal, DOS batches, Lotus macros), and 198 kB auxiliary data files have been developed.

Programs have been distributed only in compiled form (Clipper compiler for DBMS to generate exe file, pseudo ArcInfo compiler to generate cml/cmx files) for three reasons:

  • Performance, speed
  • Necessity to follow defined codes and standards
  • Intellectual property right, copyright situation

The entire software fits compressed on two floppy disks (one for GIS, one for DBMS). All programs are bi-lingual (English and Indonesian).

The success showed that all data which have been compiled through ILUD software interfaces are structurally ‘clean’, follow the same data coding, can be exchanged easily and fulfill data quality standards.

Following modules have been developed:

Tab.2: ILUD Modules

ILUDEntr DBMS Entry of field data
ILUDProc DBMS Processing of field data and transfer to GIS
ILUDList DBMS Retrieval of field data, transfer of points to GIS
ILUDUtil

DBMS

Utility set for DBMS data

ILUDArc GIS Digitizing of arcs (for lines and polygons)
ILUDLab GIS Labeling of polygons and link to DBMS
ILUDPoi GIS Digitizing of points
ILUDCon GIS Conversion between different projections
ILUDPlt GIS Plotting
ILUDUtl GIS Utility set for GIS data
ILUDAdm GIS Compilation of maps on administrative basis
ILUDMon GIS Monitoring of land use changes
ILUDR2v GIS Conversion of raster images to vector GIS
ILUDImp GIS Import of points to GIS
ILUDExp GIS Export of points from GIS to DBMS
ILUDSed GIS Assessment of land availability
ILUDKes GIS Land suitability assessment
ILUDUnt GIS Compilation of spatial land use management plans

They include in-built error trapping routines, which guarantee that the data fulfill necessary quality standards for formal data integrity.

3.4 Standard Output

It is important that data which have been collected and entered in a database, can be retrieved and transferred (or displayed or printed) in an easy and particularly standardized way !

Only when an information system can supply the data in the way as requested by the users of the data is the system justified. If, for example, the user wants to have a look at the hardcopy map for orientation only, he can be supplied with a hardcopy map. If the user wants to further process the data digitally, he can be supplied with the GIS digital data (coverage).

There are two types of ‘output’ from a geographical databank as ILUD:

  • First and foremost, the digital databank containing spatial data with reliable, useable data, following the documented data standards, easy to be used or to be re-interpreted,
  • As secondary output, the hardcopy production of printed maps.

These ‘products’ have been made uniform and standardized.

Digital data with all its codes, structures, files follow the given (and documented) syntax and standards.

The project has a standard layout for hardcopy map production at the scales of 1:25,000, 1:50,000 and 1:100,000 at DIN A0 size, following the national map grid index.

Digital outputs of the project’s mapping are various graphics formats such as BMP, PCX or PLT files, or the original data in their coverage, xBase, GIS file formats.

Beside the 'standard' output maps of land use and land use plans, the system is capable to respond on special requests, such as:

  • Generalized maps (example, only the main land use class, or the top two land use class levels etc.),
  • Maps without labels,
  • Maps which show only particular areas of interest (example, only bare land or only industrial areas),
  • Maps which are defined by an administrative unit, not a square map grid (example, land use map of a given Kabupaten),
  • Maps with English legend.

While the previous components have been fully established and implemented for ILUD in course of LREPP-II/B, the following two components have only been started with their implementation:

3.5 Marketing strategy and Public Relation Work, Distribution Policy:

‘Information not used is information better not collected !’

To enable potential clients to make use of these maps and to integrate this information in their planning efforts, they have to be aware of the data and all facilities.

Various activities, intentions and plans for such ‘public relation’ work have been set up in LREPP-II/B.

The most global PR system is the Internet. A homepage (http://www. oocities.com/Tokyo/2439/) has been set up, which shows the data progress achieved, the facilities of the system, the technical specs and options to contact the agency for data and technical advise.

Data requests can be made through the Internet. After having been cleared by BPN officials, data can be transmitted on disk or through the Internet.

A policy of distributing and/or selling data is still to be defined. Cost assessments to define a ‘service fee’ have been calculated.

3.6 Contribution to Spatial Planning

This is seen as the ultimate goal, to make all the efforts of land use data collection, processing and presentation meaningful and as a contribution to land use planning towards a sustainable, efficient and ecological use of land in Indonesia.

There are two envisaged data flows:

  • Data on actual land use shall be submitted to other authorities, which need land use data, for definition of land use plans and similar tasks.
  • In-house activities on land use assessments, land allocations, land use rights, implementation of land use plans, monitoring of land use etc. This is the topic of the following chapter.

4 What is ILUD for ?

Spatial Planning with ILUD

BPN has the task to execute land use planning through the issue of location permits, including their control and monitoring. ILUD includes these activities, to support BPN in its task. In such an application system with the task of improving land use through land use survey and monitoring tools, the target is to have a complete decision tool for management support for "spatial land use management planning".

Fig.10: Concept of Land Allocation Assignment

4.1 Availability of Land under the Actual Land Use and Legislation

Land can only be allocated to new land use pattern, if the actual land use under the land use legislation permits it. Land can not be allocated to new land uses, where steep slopes or shallow soils can not maintain a sustainable use, where land would be taken out of the main food production cycle (paddy rice land), along rivers in 50 m corridors, in already built-up areas, or in already assigned land. Most of these regulations are defined as presidential degrees.

ILUD can compile and produce maps showing these areas (overlay of land use, slope, altitude, hydrology, already allocated land).

4.2 Land Evaluation

The physical land evaluation basically follows the concept of FAO’s framework for land evaluation, with the definition of land utilization types, land characteristics, land qualities, and suitability ratings of S1-N2.

As data sources, resources maps with information about slope, altitude, drainage, erosion status, texture, drainage are linked and matched with the requirements of land use types (land utilization types, here called 'sectors'). At the present 20 of those types are defined with their requirements:

Tab.2: Considered Land Utilization Types

  • Permanent production forest
  • Limited production forest
  • Converted production forest
  • Rice paddy
  • Maize
  • Peanut
  • Soybean
  • Banana
  • Oil palm
  • Rubber
  • Cacao
  • Coffee
  • Tea
  • Animal husbandry
  • Fishery, aquaculture
  • Urban settlement
  • Rural settlement
  • Industry
  • Tourism
  • Mining

For user-friendly application, high performance and standardized output, a module to execute land evaluation, i.e. to assess the suitability in terms of suitable and unsuitable classes (S1, S2, S3, N1, N2) for specific land utilization types has been developed (module ILUDKes). It overlays slope, soils, and altitude maps, evaluates the suitability for the selected land use type for each land characteristic, and summarizes based on the limiting factor approach.

4.3 Government Policy for Development

These maps are ‘input maps’ to the spatial land use management procedure. They have been defined by planning councils at various levels, partly based on the findings of the previously explained two maps (land availability map and land suitability maps).

4.4 Land Allocation ('Spatial Land Use Management Plan')

With the two assessments of land availability and land suitability and with the input of Government policy, where land use should be developed according to the Development Plans of Indonesia (at national, provincial, or district level), land can be allocated.

The execution of this double overlay is done with module ILUDUnt.

Example: A housing complex can only be permitted, if the suitability is good (not steep slope), the availability is given (not replacing rice land), and where the development policy does not declare other priorities.

4.5 Monitoring of Land Use Changes and Location Permits

One of the most important future activities might be the monitoring, in particularly of ‘permits, the endproduct of the process of spatial planning activities ... the controlling tool of spatial planning’ (Ir. Soni Harsono, ibd).

Technically, monitoring is understood at two stages: At the first step, it is the detection of land use changes, i.e. taking two land use maps of different years and compare them. (Overlay of two maps to define units which are not equal).

At the next level - and more important in terms of land use control - is the integration of issued location permits to the land use change detection. There are following units resulting from such an overlay:

  • Land use has changed, in accordance with the issued location permit.
  • Land use has changed, without permission.
  • Land use has not changed, but a location permit was issued.
  • Land use has not changed, no location permit was issued.

5. What’s next in ILUD ?

Achievements during LREPP-II/B and Outlook on Future Development

Fig.11 below shows in the years 1993-1997 the main methodological achievements of LREPP-II/B on ILUD (databank setup) activities, to mention the:

  • Establishment of land use mapping methodology from aerial photographs,
  • Establishment of land use mapping methodology from satellite images,
  • Definition of standards, in particular the revision of the land use classification, and of file formats, file structures, and data dictionaries,
  • Cartographic design and production of hardcopy maps,

and the start of activities such as:

  • Monitoring,
  • Contribution to spatial planning,
  • Quality control,
  • Public relation work with Internet.

Fig. 11: ILUD Development

In future, as shown for the years 1997-2000, methodology development will have to concentrate on:

  • Further development of contribution to spatial land use management planning,
  • Public relation work, Internet, network setup, internal and external awareness of available data and service functions of BPN,
  • Marketing efforts with stronger customer orientation, definition of sales/ distribution policies, and stronger role of BPN as data provider to other institutions,
  • Quality control scheme (including actual check of data),
  • Management re-engineering and adjustement of the administrative and personell structure.

Beside these ‘new’ main activities, improvements shall still be done in the established fields:

  • Refinement in making land use and planning maps at administrative basis
  • Documentation, manuals, tutorials
  • Wider range of scale outprints
  • Incorporation of administrative codes of Ministery of Interior
  • Incorporation of urban mapping schemes and classification
  • Adjustement of software to new platforms/operating systems, new software versions

etc.

Maintenance of data and training will be a permanent, important activity of the information system.

Following personell structure is proposed to execute these tasks and to operate the information system:

Fig. 12: ILUD Staff Hierarchy

(image)

6. Closing Remark

It has been shown, that ILUD is more than just a few Arc/Info coverages with some field data in an attribute table: It is an entire application system of mapping land use and preparing spatial land use management plans. Thus, the application is the most important characteristic of the system: To be easily applied by different users of different skill, and to come up with the same type of result with the same standards and of the same quality.

The second characteristic, where ILUD is more than a few Arc/Info coverages, is the targetting of all activities and definitions towards the main output of supporting decision makers in different institutions with proper information about land use in the past, at the present, and in modelled future situations.

But data gathering and plotting of a land use map can not be the final goal of a land use planning support system - and of ILUD.

Technology becomes only one step in the process of defining, implementing and monitoring land use plans. Like in many other places, emphasis on the technology itself has to be reduced, more emphasis has to be given to the actual content of data and the decisions based on these data.

By making ILUD a user-friendly, robust, direct, straight-forward applicable system, this is our contribution to shifting the emphasis away from over-stressing technology, and towards an application tool for land use planning. Thus, ILUD can contribute to land use planning with supporting adequate, reliable, and up-to-date data, that it can be user-friendly, and is affordable.

Project LREPP-II/B has given a perfect environment,

  • to develop,
  • to install, and
  • to apply

the information system, as it was necessary in this ‘new digital era’ of information technology, where information - including processing of, access to and distribution of information - plays an increasingly important role for the decision making progress at land use planning. While LREPP-II/B is coming to its end, the products of the project: The ILUD methodology, system, standards will give all the strength to BPN / PGT and can hopefully contribute to the further development of Indonesia.


Back to Homepage