This is a ride that leaves from our normal starting point of HW 84 and 136th Ave in the Shenandoah Plaza parking lot (across from the Subway). From there we ride around to 130th Ave and take that all the way south to 26th St. 26th takes us to Flamingo Gardens where we then switch to casual ride mode and start to ride on part of the Davie trail system. We follow this trail to Hiatus and then hook back on the trail after going north a bit on Biatus. The trial eventually ends on Nob Hill road. We take Nob Hill south to Orange Dr and then stay on Orange, with a a hop out to Griffin at Flamingo to cross the bridges. When we get to Boy Scout Road we stop at the soon to be park for a brief break (a longer break will be available in 2002 when the park actually opens). Next we will continue back to Shenandoah Plaza following routes we use often in other rides.
Enjoy!